Search publications in CEDR public website

NameSizeHits
Safe distance between vehicles
December 13, 2015
Safe distance between vehicles
e_Distance_between_vehicles.pdf

A review of the rules and practices concerning the safe distance between two vehicles on roads
was performed in 2007 and 2008 by members of CEDR’s TG Road Safety.
Member countries were asked to answer the following questions:
- Is there a regulation that governs the safe distance between vehicles in your country?
- If so, what are the rules (e.g. leave at least 2 seconds following distance to the vehicle in
front)?
- Have you experienced any problems enforcing these rules?

0.2 MiB
7762
CR 2017-01_Implementation guide for an ISO 55001 Management System
February 23, 2017
CR 2017-01_Implementation guide for an ISO 55001 Management System
CEDR-Contractor-Report-2017-1-Implementation-Guide-for-an-ISO-55001-Managementt-System.pdf

Contractor Report 2017-1 offers guidance and advice to road organisations for establishing a formal Asset Management System that will help organisations to obtain value from their assets. It represents the primary output of the ARISE research project, which was funded under CEDR Call 2014 Asset Management and Maintenance.

2.5 MiB
6564
CEDR2013-09 Abords de chaussées qui pardonnent
December 13, 2015
CEDR2013-09 Abords de chaussées qui pardonnent
T10_Abords_de_chaussee_qui_pardonnent.pdf

Ce rapport a été rédigé par l'équipe 'Safety at the Heart of Road Design' (la sécurité au cœur de la conception des routes) de l'IRDES ERA-NET

14.2 MiB
3007
CEDR2016-1 Management Of Contaminated Runoff Water
August 26, 2016
CEDR2016-1 Management Of Contaminated Runoff Water
CEDR2016-1-Management-of-contaminated-runoff-water.pdf

The EU Water Framework Directive (WFD) aims to protect and improve the ecological status of water bodies in order to promote sustainable watershed use. Consequently, NRAs must ensure that their water management practices meet the requirements of the WFD. This report examines; when should contaminated runoff water be treated to meet the requirements in relevant EU directives (e.g. the WFD), what is the best practice when treatment is mandatory, and what will the research needs on these matters be within the next decade?

4.7 MiB
2141
F Partenariats Public-prive (PPP)
December 13, 2015
F Partenariats Public-prive (PPP)
f_Partenariats_public-prive_(PPP).pdf
3.5 MiB
2069
CEDR TR2017-02 Noise barriers
January 30, 2017
CEDR TR2017-02 Noise barriers
CEDR-TR2017-02-noise-barriers.pdf

The report is to assist NRAs in the planning, building and maintaining processes of noise barriers. The first part is dedicated to the different acoustic and non-acoustic standards and guidelines used to insure performance. The second focuses on the types of barriers, looking at the aesthetic appeal, shapes and materials with a reference to the experience from the CEDR member countries. The last chapter offers a review of recent research projects on noise reducing devices.

6.7 MiB
1937
CEDR Call 2016 Information Dec 2016
December 16, 2016
CEDR Call 2016 Information Dec 2016
CEDR-Call-2016-Information-Dec-2016.pdf
0.2 MiB
1820
T10 Forgiving roadsides
December 13, 2015
T10 Forgiving roadsides
T10_Forgiving_roadsides.pdf
9.2 MiB
1806
E Road Pricing
December 13, 2015
E Road Pricing
e_Road pricing.pdf
0.9 MiB
1501
CEDR Strategy 2016 Brochure Web
July 14, 2016
CEDR Strategy 2016 Brochure Web
CEDR_STRATEGY_2016_brochure_web.pdf

At its meeting in Warsaw, the Governing Board approved a new strategy for the organisation. The CEDR Strategy comprises the Vision, Mission and Strategic Goals.

3.7 MiB
1385
CEDR TR2017-01-noise-reducing pavements
January 30, 2017
CEDR TR2017-01-noise-reducing pavements
CEDR-TR2017-01-noise-reducing-pavements.pdf

This Technical Report primarily on the collection, dissemination, implementation and use of results from research and development of noise-reducing pavements from recent innovative research projects undertaken within specific CEDR member states. The report can be seen as a handbook presenting the European state of the art in the mid-2010s. The target group for this report is road engineers, planners and decision makers.

4.0 MiB
1304
03 Rismetdeliverable3
November 25, 2016
03 Rismetdeliverable3
03_rismetdeliverable3.pdf
0.9 MiB
1293
CEDR2016-4 N1 TEN-T-Performance-Report
December 20, 2016
CEDR2016-4 N1 TEN-T-Performance-Report
CEDR2016-4_N1_TEN-T-Performance-Report.pdf

Fourth biennial report on the performance of the TEN-T (Roads) network within CEDR member countries. The report is a useful source of information for individual National Road Administrations (NRAs), regulatory bodies, and others for benchmarking purposes and for setting national performance targets.

5.4 MiB
1211
Technical Report 2017/06 - Asset Management
July 10, 2017
Technical Report 2017/06 - Asset Management
CEDR_TR2017-06-Asset-Management.pdf

This report reflects the findings of the CEDR Task Group on Asset Management within CEDR Strategic Plan 3 - 2013-2017 (SP3), aiming to provide a perspective on strengthening of cooperation and learning from road agencies in Europe within the asset management arena.

2.0 MiB
1139
Main Road Safety Challenges For European Road Directors Oct2016
October 20, 2016
Main Road Safety Challenges For European Road Directors Oct2016
Main_Road_Safety_Challenges_for_European_Road_Directors_Oct2016.pdf

Written by CEDR's Road Safety Group and endorsed the Governing Board of the European Road Directors, this paper highlights some key challenges for NRAs emphasising the need to maintain the ongoing open and creative discussion across the NRAs to work together to advance Road Safety.

0.7 MiB
1128
Changement Climatique
December 13, 2015
Changement Climatique
T16_Changement_climatique.pdf
5.5 MiB
1103
TR2017-05 Utilising BIM for NRAs
April 12, 2017
TR2017-05 Utilising BIM for NRAs
Utilising-BIM-for-NRAs-TR2017-05.pdf

The purpose of this report is to inform NRAs about the results of the CEDR Task group on Building Information Modelling (BIM). This has the goal to enhance the possibilities of the client in handling data and improving the quality of data using open BIM standards in the lifecycle of assets.

2.9 MiB
1092
E Road Noise
December 13, 2015
E Road Noise
e Road noise.pdf
4.5 MiB
1031
CEDR TR2017-03 Noise CBA-CEA
January 30, 2017
CEDR TR2017-03 Noise CBA-CEA
CEDR-TR2017-03-Noise-CBA-CEA.pdf

This report presents an introduction to economical assessment methods in general and their potential role in the decision-making process of noise impact assessments or implementation of noise mitigation measures in national road administrations.

2.5 MiB
1031
D1.1 Report On Available Test And Mix Design Procedures For Cold-recycled Bitumen Stabilised Materials
November 15, 2016
D1.1 Report On Available Test And Mix Design Procedures For Cold-recycled Bitumen Stabilised Materials
D1.1-Report-on-available-test-and-mix-design-procedures-for-cold-recycled-bitumen-stabilised-materials_2.pdf
2.4 MiB
1016
CEDR2016-5 Acting On Climate Change
December 20, 2016
CEDR2016-5 Acting On Climate Change
CEDR2016-5_Acting-on-climate-change.pdf

For NRAs, it is important to recognise changes in time in order to reduce greenhouse gas emissions and provide more resilience for existing and proposed roads. Acting on climate change is not a unified topic for road owners; both mitigation and adaptation to climate change are different sub-topics. Despite the dissimilarities, adaptation and mitigation share the need for long-term planning for an uncertain but undoubtedly different future. Both topics are, therefore, presented in this report.

3.8 MiB
1009
TR2017-04 Funding formulas for roads
April 20, 2017
TR2017-04 Funding formulas for roads
TR2017-04-Funding-formulas-for-roads.pdf

This report includes a complete catalogue of the different funding formulas currently available for roads and an assessment on which ones are more suitable regarding certain criteria defined in the document.

3.0 MiB
996
TR2017-03 State of the art in managing road traffic noise: summary report
June 12, 2017
TR2017-03 State of the art in managing road traffic noise: summary report
CEDR2017-03-State-of-the-art-in-managing-road-traffic-noise.pdf

The latest innovative research in the areas of noise reducing pavements, noise barriers, and
cost-benefit analysis (CBA)/cost-effectiveness analysis (CEA) was comprehensively reviewed
and assessed by CEDR Task Group I6 (Road Noise).

0.6 MiB
936
Road Safety Investments Reports
December 13, 2015
Road Safety Investments Reports
e_Road_Safety_Investments_Report.pdf
1.2 MiB
931
CEDR Contractor Report 2016-2
July 12, 2016
CEDR Contractor Report 2016-2
CEDR-CR-2016-2-Call-2012-Safety.pdf

This Final Programme Report covers two projects (ASAP and BRoWSER) from the CEDR Research Call 2012 on Safety, which address key issues around road worker and road user safety.

2.0 MiB
915
Open information exchange (BIM)
May 31, 2016
Open information exchange (BIM)
CEDR2016-leaflet01-BIM.pdf

Standardisation and simplification of the working processes of your NRA and improved validation of your data and improved infrastructure at lower costs is the expected result of using BIM.

0.4 MiB
892
Incident Management
December 13, 2015
Incident Management
e_Incident_Management.pdf
6.6 MiB
861
2017-5 Conditions For Efficient Road Transport - Report
August 3, 2017
2017-5 Conditions For Efficient Road Transport - Report
2017-5-Conditions-for-efficient-road-transport-report.pdf

The report presents a CEDR wide review of issues related to efficient road transport and heavy vehicle issues. Considerations include the regulatory issues such as weights and dimensions relating to road safety and infrastructure protection.

1.6 MiB
848
Traffic Management
December 13, 2015
Traffic Management
T12_Traffic_management.pdf
3.7 MiB
800
Bandes rugueuses
December 13, 2015
Bandes rugueuses
f_Bandes_rugueuses.pdf
0.2 MiB
789
CR 2017-07_Call 2015 Freight and Logistics in a Multimodal Context_Understanding what influences modal choice
December 8, 2017
CR 2017-07_Call 2015 Freight and Logistics in a Multimodal Context_Understanding what influences modal choice
CR-2017-7_Call-2015-Freight-and-Logistics-in-a-Multimodal-Context_Understanding-what-influences-modal-choice.pdf
4.0 MiB
785
CEDR Contractor Report 2016-1
June 30, 2016
CEDR Contractor Report 2016-1
CEDR-CR-2016-1-Climate-Change-Call2012-final.pdf

This report provides an analysis of the ROADAPT (Roads for today, Adapted for tomorrow) and CliPDaR (Design guideline for a transnational database of downscaled Climate Projection Data for Road impact models) projects and provides concise recommendations on how to disseminate and implement the products of both projects.

2.0 MiB
777
F Gestion Du Bruit
December 13, 2015
F Gestion Du Bruit
f Gestion du bruit.pdf
4.7 MiB
740
CEDR2016-2 Efficiency In Road Public Procurement
June 30, 2016
CEDR2016-2 Efficiency In Road Public Procurement
Efficiency-in-Road-Public-Procurement.pdf

This report is the result of a survey conducted within task group S6 (TG S6) into perceived common procurement issues and the solutions applied in participating countries. Eight survey
topics were selected on the basis of:
- urgency and difficulty (qualification and selection of bidders, the most economically advantageous tender, abnormally low tenders, dispute resolution);
- political urgency (the role of small and medium-sized enterprises, social return);
- additions to the new Procurement Directive (innovation, past performance).

1.0 MiB
730
Road Administration Data Exchange Format
December 13, 2015
0.7 MiB
710
Factsheet
September 8, 2016
Factsheet
Factsheet-Jobexchange
0.2 MiB
679
Orientation clients
December 13, 2015
Orientation clients
f_Orientation_Clients.pdf
5.1 MiB
667
E EU Funds For Roads
December 13, 2015
E EU Funds For Roads
e_EU_funds_for_roads.pdf
1.6 MiB
664
Climate Change
December 13, 2015
Climate Change
T16_Climate_change.pdf
5.8 MiB
654
2016-CEDR GB Automated Driving-position-v04a
June 30, 2016
2016-CEDR GB Automated Driving-position-v04a
2016-CEDR_GB_Automated_driving-position-v04a.pdf

This position paper reflects the GB view based on a workshop on road vehicle automation, facilitated by CEDR Task Group “Utilising ITS for NRAs” and complements the CEDR ITS Position Paper (issued 2014).

0.2 MiB
648
Variables Messages Signs
December 13, 2015
Variables Messages Signs
e_Variable_Message_Signs.pdf
2.1 MiB
643
Gestion du trafic
December 13, 2015
Gestion du trafic
T12_Gestion_du_trafic.pdf
3.7 MiB
640
Mitigating climate change.pdf
December 13, 2015
Mitigating climate change.pdf
T17_Mitigating_climate_change.pdf
7.3 MiB
633
Road Safety Investments Summary
December 13, 2015
Road Safety Investments Summary
e_Road_Safety_Investments_Summary.pdf
0.5 MiB
631
Bruit Routien
December 13, 2015
Bruit Routien
T8_Bruit_routier.pdf
3.6 MiB
615
Lv Celu Maksas
December 13, 2015
Lv Celu Maksas
lv_Celu_maksas.pdf
1.1 MiB
613
00 Enr Energy Final Report 2014
December 2, 2016
00 Enr Energy Final Report 2014
00_enr-energy_final_report-2014.pdf
0.7 MiB
613
8b. Job posting - example 1.0
October 5, 2016
8b. Job posting - example 1.0
8b.-Job-posting-Example_Ver-1.0.pdf
42 KiB
601
8a. Job posting - template 1.0
October 5, 2016
8a. Job posting - template 1.0
8a.-Job-posting-Template_Ver-1.0.pdf
38 KiB
600
Futur réseau routier
December 13, 2015
Futur réseau routier
f_Futur_reseau_routier_FERN.pdf
3.0 MiB
590
E Public Private Partnerships (PPP)
December 13, 2015
E Public Private Partnerships (PPP)
e_Public_private_partnerships_(PPP).pdf
3.4 MiB
583
TENT Performance Report 2013
December 13, 2015
TENT Performance Report 2013
TENT_Performance_Report_2013.pdf

This is the third biennial report produced by CEDR on the performance of the trans-European road network, TEN-T (Roads). It builds on previous reports to show that it is possible to produce comparable information on the performance of the TEN-T (Roads) network within the majority of CEDR member countries

6.3 MiB
580
CEDR2017-02 Utilising ITS for NRAs
May 3, 2017
CEDR2017-02 Utilising ITS for NRAs
CEDR2017-02-Utilising-ITS-for-NRAs_2.pdf

This report outlines the main achievements and conclusions of CEDR task group N7 (ITS for NRAs, TG N7) during CEDR’s Strategic Plan 3 (SP3) 2013–2017.

1.8 MiB
575
Winter service research needs 2015
December 13, 2015
Winter service research needs 2015
Winter_service_research_needs_2015.pdf

CEDR task group N3 (Winter maintenance standards) was tasked with providing CEDR with information about winter maintenance standards, procedures and operational methods and challenges as well as a list of possible research topics from the field of winter service that could be used in CEDR research calls.

2.5 MiB
574
Future road networks FERN
December 13, 2015
Future road networks FERN
e_Future_road_networks_FERN.pdf
3.0 MiB
561
CEDR2016-3 Energy Efficiency for roads
December 13, 2016
CEDR2016-3 Energy Efficiency for roads
CEDR2016-3_Energy-Efficiency_final.pdf

There are numerous interventions available to road operators that can be used to reduce energy use. This situation is both positive (options are available) and negative (it is hard to select the best option). This document identifies most of the interventions currently implemented by at least one NRA together with an easily understood assessment of the economic return, environmental and safety impact, and political acceptability of these interventions.

1.4 MiB
551
E BEXPRAC
December 13, 2015
E BEXPRAC
e_BEXPRAC.pdf
1.7 MiB
546
P2R2C2  - Study of Water Effects on Asphalt and Porous Asphalt
November 17, 2016
2.4 MiB
541
CEDR2017-01 Reducing congestion with integrated network management
May 3, 2017
CEDR2017-01 Reducing congestion with integrated network management
CEDR2017-01-Reducing-congestion-with-integrated-network-management-INM_2.pdf

Smart mobility solutions such as integrated network management (INM) can help reduce congestion, ensure more efficient, safer, and cleaner transportation, and improve services for road users. When viewed from this perspective, integrated network management is defined as ‘an approach that includes both traffic management and traffic information measures integrated and managed within a transport network’ and is seen both as essential for the effective reduction of congestion and a no-regrets development.

2.9 MiB
541
CR 2017-03_Call 2012 Noise ON-AIR Guidance Book on the Integration of Noise in Road Planning
December 5, 2017
CR 2017-03_Call 2012 Noise ON-AIR Guidance Book on the Integration of Noise in Road Planning
CEDR-Contractor-Report-2017-03_Call-2012-Noise_ON-AIR-Guidance-Manual.pdf
6.5 MiB
541
Rumble strips
December 13, 2015
Rumble strips
e_Rumble_strips.pdf
0.2 MiB
536
LCC and NRAs
December 13, 2015
LCC and NRAs
T3_LCC_and_NRAs.pdf
10.6 MiB
521
Road Noise
December 13, 2015
Road Noise
T8_Road_noise.pdf

At the start of the CEDR RN2 work programme, it was identified that the noise mapping and action planning requirements of the EU Environmental Noise Directive (END) would form a significant component of the group's activities. Five subgroups were established to review and monitor activities associated with END noise mapping, END action planning, value for money in road traffic noise abatement, the EU noise calculation model (CNOSSOS-EU), and road noise research needs.

3.6 MiB
517
Attenuation du changement climatique
December 13, 2015
Attenuation du changement climatique
T17_Attenuation_du_changement_climatique.pdf
7.0 MiB
516
Panneaux Messages Variables R
December 13, 2015
Panneaux Messages Variables R
f_Panneaux_msgs_variables_R.pdf
2.7 MiB
512
F Vehicules 60-t
December 13, 2015
F Vehicules 60-t
f_Vehicules_60-t.doc
1.1 MiB
506
European Road User Survey 2006
December 13, 2015
3.4 MiB
504
F Tarification Routiere
December 13, 2015
F Tarification Routiere
f_Tarification_routiere.pdf
1.0 MiB
501
Lv Nakotnes Celu Tikli FERN
December 13, 2015
Lv Nakotnes Celu Tikli FERN
lv_Nakotnes_celu_tikli_FERN.pdf

Latvian version of Future European Road Network

1.1 MiB
499
E Traffic Incident Management
December 13, 2015
E Traffic Incident Management
e_Traffic_Incident_Management.pdf
1.6 MiB
498
F Investissements Securite Routiere Rapport
December 13, 2015
F Investissements Securite Routiere Rapport
f_Investissements_Securite_Routiere_rapport.doc
2.4 MiB
493
E Road Lighting
December 13, 2015
E Road Lighting
e_Road_lighting.pdf
1.5 MiB
493
Guidelines for the use of Statistical and Dynamical Downscaling results as input for impact models (D1.3)
November 23, 2016
Guidelines for the use of Statistical and Dynamical Downscaling results as input for impact models (D1.3)
CliPDaR_D1.3_final_-_guideline_for_use_downscaling_results_in_models.pdf
2.6 MiB
488
2017-05 Conditions For Efficient Road Transport - Appendices
August 3, 2017
2017-05 Conditions For Efficient Road Transport - Appendices
2017-05-Conditions-for-efficient-road-transport-Appendices.pdf

Appendices of the CEDR Report 2017-05 on conditions for efficient road transport in Europe. Presents the results of CEDR survey on heavy vehicles.

1.2 MiB
478
Role des ARN dans STI.
December 13, 2015
Role des ARN dans STI.
T14_Role_des_ARN_dans_STI.pdf

Ce rapport présente une évaluation stratégique et des recommandations adressées à la CEDR et aux ARN, sur les thèmes suivants; ,
Plan d'action STI de l'UE et directive sur les STI de la COM, EasyWay et projet(s) suivant(s), iMobility, Services prioritaires et qualité des données, Systèmes coopératifs, Orientations pour la recherche

2.2 MiB
476
Prezi CEDR Exchange Program
September 26, 2016
Prezi CEDR Exchange Program
cedr-exchange-program.html
66 KiB
475
Presentation Of CEDR 2007
January 2, 2016
Presentation Of CEDR 2007
Presentation_of_CEDR_2007.pdf
0.8 MiB
469
NRAs roles in ITS
December 13, 2015
NRAs roles in ITS
T14_NRAs_roles_in_ITS.pdf

This report provides CEDR and NRAs with a strategic assessment and recommendations in the following areas;
EU ITS Action Plan and EC ITS Directive, EasyWay and follow-up project(s), iMobility, priority services and data quality, cooperative systems and research guidance

3.3 MiB
460
F Fonds UE Pour Les Routes
December 13, 2015
F Fonds UE Pour Les Routes
f_Fonds_UE_pour_les_routes.pdf
1.6 MiB
448
Page 2 / 59
December 13, 2015
Page 2 / 59
f_RTE-T_Performances_2011.pdf
7.0 MiB
444
CR 2017-02_Call 2012 Noise End of Programme Report
December 5, 2017
CR 2017-02_Call 2012 Noise End of Programme Report
CEDR-Contractor-Report-2017-02_Call-2012-Noise-End-of-Programme-Report.pdf
2.0 MiB
443
European Road User Survey 2004
December 13, 2015
1.3 MiB
440
Congestion Policies
December 13, 2015
Congestion Policies
e_Congestion_Policies.pdf
1.4 MiB
439
Road Data
December 13, 2015
Road Data
e_Road_Data.pdf
0.8 MiB
438
POTHOLE
November 18, 2016
POTHOLE
03_pothole_d3-techniques-and-materials-study.pdf
3.0 MiB
437
Earn D2 Report On The Results Of The Laboratory Tests
November 24, 2016
Earn D2 Report On The Results Of The Laboratory Tests
earn_d2_report_on_the_results_of_the_laboratory_tests.pdf
1.1 MiB
437
F Investissements Securite Routiere Synthese
December 13, 2015
F Investissements Securite Routiere Synthese
f_Investissements_Securite_Routiere_Synthese.doc
1.1 MiB
435
E Procurement Of ITS
December 13, 2015
E Procurement Of ITS
e_Procurement_of_ITS.pdf
0.5 MiB
433
F Gestion Des Incidents De La Circulation
December 13, 2015
F Gestion Des Incidents De La Circulation
f_Gestion_des_incidents_de_la_circulation.pdf
1.6 MiB
432
Customer Orientation
December 13, 2015
Customer Orientation
e_Customer_Orientation.pdf
4.1 MiB
422
F Donnees Routieres
December 13, 2015
F Donnees Routieres
f_Donnees_routieres.pdf
1.0 MiB
421
F Eclairage Des Routes
December 13, 2015
F Eclairage Des Routes
f_Eclairage_des_routes.pdf
3.3 MiB
417
utsrponigedaSPMI
November 18, 2016
utsrponigedaSPMI
01_intemat4pms_deliverable1.pdf
1.4 MiB
406
Wildlife and traffic
December 13, 2015
Wildlife and traffic
e_Wildlife_and_traffic.pdf
1.5 MiB
405
F BEXPRAC
December 13, 2015
F BEXPRAC
f_BEXPRAC.pdf
1.7 MiB
401
D4.1 Assessing the Acoustic Durability Of Noise Barriers On NRA Roads
November 24, 2016
D4.1 Assessing the Acoustic Durability Of Noise Barriers On NRA Roads
QUESTIM-Deliverable-D4-1-Acoustic-Durability-of-Noise-Barriers-on-NRA-roads.pdf
2.0 MiB
400
07 Liccer D5.2 Norwegian Case Study Report
December 15, 2016
07 Liccer D5.2 Norwegian Case Study Report
07_liccer_d5.2_norwegian-case-study-report.pdf
0.7 MiB
392
Guidelines
November 23, 2016
Guidelines
ROADAPT_integrating_main_guidelines.pdf
1.0 MiB
391
The Move of the European Road Administrations towards Network Operations
December 13, 2015
1.4 MiB
388
F Synthese Plan Strategique 05-09
December 13, 2015
F Synthese Plan Strategique 05-09
f_Synthese_plan_strategique_05-09.pdf
1.8 MiB
386
A MANAGEMENT
December 13, 2003
A MANAGEMENT
e_Road_Data_-_Best_Practice_Guide.pdf
1.2 MiB
382
1. Candidate Qualities 1.0
October 5, 2016
1. Candidate Qualities 1.0
1.-Candidate-Qualities_Ver-1.0.pdf
0.2 MiB
381
Call for EXPRESSION OF INTEREST
March 1, 2017
Call for EXPRESSION OF INTEREST
Call-for-expression-of-interest-to-host-TRA.pdf
51 KiB
381
D Handbuch Normungswesen
December 13, 2015
D Handbuch Normungswesen
d_Handbuch_Normungswesen.doc
1.4 MiB
380
Contractor Report 2017-05 Findings Of An Investigation Into Issues Around The Implementation And Use Of The CPR By NRAs-December Version
December 5, 2017
Contractor Report 2017-05 Findings Of An Investigation Into Issues Around The Implementation And Use Of The CPR By NRAs-December Version
Contractor-Report-2017-05-Findings-of-an-investigation-into-issues-around-the-implementation-and-use-of-the-CPR-by-NRAs-December-version.pdf

Results of a study to review areas in which CEDR and other parties have concerns or lack clarity regarding CPR; issues such as the divide between construction products which are be covered by CPR and civil engineering works which are not as well as the interaction between CPR and the Public Procurement directive

1.4 MiB
376
CliPDaR D3.1 Final Guidelines For Coping With ColdWinters HotSummers
November 23, 2016
CliPDaR D3.1 Final Guidelines For Coping With ColdWinters HotSummers
CliPDaR_D3.1_final_Guidelines_for_coping_with_coldWinters_hotSummers.pdf
4.8 MiB
375
D3.1 State-of-the-art on secondary functions for pavements and noise screens
November 24, 2016
D3.1 State-of-the-art on secondary functions for pavements and noise screens
DISTANCE-BRRC-D31-V01-010415-State-of-the-art-on-secondary-functions-of-noise-barriers-and-pavements.pdf
2.7 MiB
371
Project Nr. 823129
November 18, 2016
Project Nr. 823129
01_D3-1_20110502.pdf
1.1 MiB
369
POTHOLE
November 18, 2016
POTHOLE
05_pothole-d5-final-report.pdf
0.4 MiB
365
Executive summaries of CEDR reports 2014-2017
November 16, 2017
Executive summaries of CEDR reports 2014-2017
TR2017-07-Exec-Summaries-of-CEDR-reports-2014-2017.pdf

This report provides a compilation of executive summaries from CEDR’s reports published under the Third Strategic Plan (SP3) in the period 2014-2017

1.9 MiB
365
CEDR-Symposium-Programme-final
March 17, 2017
CEDR-Symposium-Programme-final
CEDR-Symposium-Programme-final.pdf
2.6 MiB
363
8.0 MiB
359
2008 Guide On Standardisation
December 13, 2015
2008 Guide On Standardisation
e_Guide_on_Standardisation.doc
1.3 MiB
358
02 EuRSI D3.2 Final August 2011
November 18, 2016
02 EuRSI D3.2 Final August 2011
02_EuRSI_D3.2_Final_August_2011.pdf
1.8 MiB
358
Network Operations
December 13, 2015
Network Operations
e_Network_Operations.pdf
0.7 MiB
357
Earn D3 Effects Found From Reviews
November 24, 2016
Earn D3 Effects Found From Reviews
earn_d3_effects_found_from_reviews.pdf
1.5 MiB
357
Emergency bridges
December 13, 2015
Emergency bridges
e_Emergency_Bridges.pdf
1.1 MiB
356
F Marches Publics Des STI
December 13, 2015
F Marches Publics Des STI
f_Marches_publics_des_STI.pdf
0.5 MiB
355
2-8-Bjarne-Schmidt-Pavements-reducing-rolling-resistance.pdf
May 19, 2017
2-8-Bjarne-Schmidt-Pavements-reducing-rolling-resistance.pdf
2-8-Bjarne-Schmidt-Pavements-reducing-rolling-resistance.pdf
2.4 MiB
354
Summaries Final Reports 2010-2014
December 21, 2015
Summaries Final Reports 2010-2014
Summaries_final_reports_2010-2014.pdf

This report provides a compilation of the executive summaries in CEDR's Final Reports published under CEDR's Second Strategic Plan. These reports were published in the period 2010-2014.
All reports are available in English and French.

1.3 MiB
349
RISK MANAGEMENT FOR ROADS IN A
November 17, 2016
RISK MANAGEMENT FOR ROADS IN A
01_Rimarocc-Guidebook.pdf
2.0 MiB
346
ENR2011 DESIGN POTHOLE Project Description
November 18, 2016
ENR2011 DESIGN POTHOLE Project Description
00_enr2011-design-project-description-pothole.pdf
37 KiB
345
TEN-T Performances 2011
December 13, 2015
TEN-T Performances 2011
e_TEN-T_Performances_2011.pdf
5.4 MiB
342
03 Liccer D3 Second Workshop Report
December 14, 2016
03 Liccer D3 Second Workshop Report
03_liccer_d3_second-workshop-report.pdf
6.1 MiB
342
E 60-t Vehicles
December 13, 2015
E 60-t Vehicles
e_60-t_Vehicles.doc
1.1 MiB
341
4- Leon Brain 20170106 CEDR Workshop - EC Road Transport Security
February 8, 2017
4- Leon Brain 20170106 CEDR Workshop - EC Road Transport Security
4-Leon-Brain-20170106-CEDR-workshop-EC-Road-Transport-Security.pptx
0.1 MiB
341
Pt Inquerito A Utentes 2006
December 13, 2015
Pt Inquerito A Utentes 2006
Pt_Inquerito_a_utentes_2006.pdf
0.6 MiB
337
7-Tom Debruyn AWV Presentatie Transmigratie (1)
February 8, 2017
7-Tom Debruyn AWV Presentatie Transmigratie (1)
7-Tom-Debruyn-AWV-Presentatie-transmigratie-1.pptx
11.9 MiB
337
1-Tom Roelants 20170206-presentation-Agency For Roads And Traffic (1)
February 8, 2017
1-Tom Roelants 20170206-presentation-Agency For Roads And Traffic (1)
1-Tom-Roelants-20170206-presentation-Agency-for-roads-and-traffic-1.pptx
6.8 MiB
336
T3 Les ARN Et LCC
December 13, 2015
T3 Les ARN Et LCC
T3_Les_ARN_et_LCC.pdf
13.7 MiB
335
9d. Welcome to the Netherlands
September 26, 2016
9d. Welcome to the Netherlands
Welcome-to-the-Netherlands.docx
0.6 MiB
335
Annex of Final Report (D 3.2)
November 23, 2016
Annex of Final Report (D 3.2)
CliPDaR_D3.2_Annex_Design_Guideline.pdf
0.6 MiB
331
Report on the workshop held in Vienna at the ZAMG from the 6th to the 8th May 2013 ‘meeting the operators’ (D2.1)
November 23, 2016
1.8 MiB
330
04 Liccer D4.1 Guideline Report
December 14, 2016
04 Liccer D4.1 Guideline Report
04_liccer_d4.1_guideline-report.pdf
3.2 MiB
329
Gestion des incidents
December 13, 2015
Gestion des incidents
f_Gestion_des_incidents.pdf
7.1 MiB
328
FFoorrggiivviinngg  RRooaaddssiiddee  DDeessiiggnn  GGuuiiddee,,  30.11.2011
November 18, 2016
FFoorrggiivviinngg RRooaaddssiiddee DDeessiiggnn GGuuiiddee,, 30.11.2011
04_IRDES_D3_Forgiving_Roadside_Guidelines_V2.0_31.1.2012.pdf
7.9 MiB
328
Distance entre les véhicules
December 13, 2015
Distance entre les véhicules
f_Distance_entre_les_vehicules.pdf
0.2 MiB
326
11 Deliverable N9
November 17, 2016
11 Deliverable N9
11_Deliverable-N9.pdf
3.1 MiB
325
Report-D5.2-Guide-for-using-suitable-eco-balance-tools-to-evaluate-the-environmental-compatibility-of-cold-recycling
November 22, 2016
Report-D5.2-Guide-for-using-suitable-eco-balance-tools-to-evaluate-the-environmental-compatibility-of-cold-recycling
Report-D5.2-Guide-for-using-suitable-eco-balance-tools-to-evaluate-the-environmental-compatibility-of-cold-recycling.pdf
1.1 MiB
325
Faune et Trafic
December 13, 2015
Faune et Trafic
f_Faune_et_trafic.pdf
8.0 MiB
324
3-Kim Johansen StowawaysinEurope KimJ 6022017
February 8, 2017
3-Kim Johansen StowawaysinEurope KimJ 6022017
3-Kim-Johansen-StowawaysinEurope_KimJ_6022017.pptx
7.4 MiB
324
3. Responsibilities 1.0
August 25, 2016
3. Responsibilities 1.0
3.-Responsibilities-CEDR-exchanges_Ver-1.0.docx
34 KiB
321
Strategic Plan 2013-2017
May 16, 2013
Strategic Plan 2013-2017
Strategic_Plan_2013-2017.pdf
0.8 MiB
320
Networking for Urban Vitality
August 8, 2016
Networking for Urban Vitality
Summary-Report-NUVit-23-june-2016-EU2016.pdf
1.9 MiB
317
4a. Final feedback form exchange candidate 1.0
August 25, 2016
4a. Final feedback form exchange candidate 1.0
4.-CEDR-Exchange-Programme-Feedback-from-the-exchange-candidate_Ver-1.0.pdf
0.2 MiB
317
2017-04 TEN-T Tender V2
April 10, 2017
2017-04 TEN-T Tender V2
2017-04-TEN-T-tender-v2_2.docx
44 KiB
316
D3.1-Report-on-incorporation-of-cold-recycled-pavement-layers-in-empirical-and-mechanistic-pavement-design-procedures
November 22, 2016
D3.1-Report-on-incorporation-of-cold-recycled-pavement-layers-in-empirical-and-mechanistic-pavement-design-procedures
D3.1-Report-on-incorporation-of-cold-recycled-pavement-layers-in-empirical-and-mechanistic-pavement-design-procedures.pdf
1.0 MiB
315
D5.1 Critical guidelines to the effective implementation of alternative “smart” noise mitigation measures
November 24, 2016
D5.1 Critical guidelines to the effective implementation of alternative “smart” noise mitigation measures
DISTANCE-ANAS-D51-V01-06102015-Critical-guidelines-to-the-effective-implementation-of-alternative-smart-noise-mitigation-measures.pdf
2.2 MiB
313
C ROADS
February 8, 2017
C ROADS
20160314_CEDR-workshop-Electric-Road-Systems_03_Viktoria-ICT.pdf
1.4 MiB
313
1-6-Jakob-Fryd-Cost-Benefit-Report.pdf
May 19, 2017
1-6-Jakob-Fryd-Cost-Benefit-Report.pdf
1-6-Jakob-Fryd-Cost-Benefit-Report.pdf
2.5 MiB
312
Les mesures les plus efficaces pour
December 13, 2015
Les mesures les plus efficaces pour
f_Securite_routiere_mesures.pdf
8.0 MiB
307
F Manuel De Normalisation
December 13, 2015
F Manuel De Normalisation
f_Manuel_de_normalisation.doc
1.3 MiB
306
9b. Welcome to Hungary
September 26, 2016
9b. Welcome to Hungary
Welcome-to-Hungary.docx
0.4 MiB
298
utsrponigedaSPMI
November 18, 2016
utsrponigedaSPMI
05_intemat4pms_finalreport.pdf
2.1 MiB
298
CEDR Call 2012 Noise - Final Programme Report
November 28, 2016
CEDR Call 2012 Noise - Final Programme Report
CEDR-Call-2012-Noise-Final-Programme-Report.pdf
1.7 MiB
298
5. Exchange contract 1.0
August 25, 2016
5. Exchange contract 1.0
7.-Exchange-contract_Ver-1.0_2.docx
0.1 MiB
297
ERA NET Road
November 18, 2016
ERA NET Road
07_ENR-SRO1_EuRSI.pdf
1.8 MiB
295
07 ENR SRO1 Project SPACE Joint Meeting Presentations 040310
November 25, 2016
07 ENR SRO1 Project SPACE Joint Meeting Presentations 040310
07_ENR-SRO1_project-SPACE_Joint-Meeting-Presentations_040310.pdf
1.4 MiB
295
RECYPMA
November 18, 2016
RECYPMA
04_recypma_d6_finalreport.pdf
0.5 MiB
293
2008 Guide On Standardisation (Swedish)
December 13, 2015
2008 Guide On Standardisation (Swedish)
se_Guide_on_Standardisation_in_Swedish.doc
1.3 MiB
290
2. Code of conduct 1.0
August 25, 2016
2. Code of conduct 1.0
2.-Code-of-Conduct_Ver-1.0.docx
34 KiB
290
9a. Welcome to Denmark
September 26, 2016
9a. Welcome to Denmark
Welcome-to-Denmark.docx
1.5 MiB
288
E Summary Strat Plan 05-09
December 13, 2010
E Summary Strat Plan 05-09
e_Summary_strat_plan_05-09.pdf
1.8 MiB
286
Exploitation des réseaux
December 13, 2015
Exploitation des réseaux
f_Exploitation_des_reseaux.pdf
0.7 MiB
283
Guideline: Part B performing a Quick scan on risk due to climate change
November 23, 2016
5.5 MiB
283
Guideline part E: Selection of adaptation measures and strategies for mitigation
November 23, 2016
6.9 MiB
283
AllBack2Pave FinalWorkshop 2
November 24, 2016
AllBack2Pave FinalWorkshop 2
AllBack2Pave_FinalWorkshop_2.pdf
2.1 MiB
282
F SURE 2006
December 13, 2015
F SURE 2006
f_SURE_2006.doc
3.4 MiB
281
Report on the first Workshop 25-27 February 2013 (D1.1)
November 23, 2016
Report on the first Workshop 25-27 February 2013 (D1.1)
CliPDaR_D1.1_final_-_report_of_workshop_Febr_2013.pdf
0.8 MiB
279
Politiques de congestion
December 13, 2015
Politiques de congestion
f_Politiques_de_congestion.pdf
1.6 MiB
277
05 Liccer D4.2 Technical Report
December 15, 2016
05 Liccer D4.2 Technical Report
05_liccer_d4.2_technical-report.pdf
2.1 MiB
277
06 Liccer D5.1 Swedish Case Study Report
December 15, 2016
06 Liccer D5.1 Swedish Case Study Report
06_liccer_d5.1_swedish-case-study-report.pdf
0.6 MiB
276
2-6-Inge-van-Vilsteren-Porous-Asphalt-in-the-Netherlands.pdf
May 19, 2017
2-6-Inge-van-Vilsteren-Porous-Asphalt-in-the-Netherlands.pdf
2-6-Inge-van-Vilsteren-Porous-Asphalt-in-the-Netherlands.pdf
1.3 MiB
275
Position Paper on ITS
December 13, 2015
Position Paper on ITS
e_Position_Paper_on_ITS.pdf
76 KiB
274
Report on the outcome of the combined meeting (CliPDaR and ROADAPT), 3-4 April 2013 (D1.2)
November 23, 2016
Report on the outcome of the combined meeting (CliPDaR and ROADAPT), 3-4 April 2013 (D1.2)
CliPDaR_D1.2_final_-_report_of_combined_CliPDaR_ROADAPT_meeting_April_2013.pdf
1.5 MiB
274
9-Dirk Penasse ESPORG Presentation 6-2-17 Version01
February 8, 2017
9-Dirk Penasse ESPORG Presentation 6-2-17 Version01
9-Dirk-Penasse-ESPORG_presentation-6-2-17-version01.ppt
7.4 MiB
274
Article From Denmark To Qatar - Paw Nielsen
September 26, 2016
Article From Denmark To Qatar - Paw Nielsen
Article-from-Denmark-to-Qatar-Paw-Nielsen.docx
0.8 MiB
271
Dresden Asphalt Days 20151209
November 24, 2016
Dresden Asphalt Days 20151209
Dresden-Asphalt-Days_20151209.pdf
1.2 MiB
269
Pt Guia Normalizacao
December 13, 2015
Pt Guia Normalizacao
pt_Guia_Normalizacao.doc
1.3 MiB
268
CliPDaR D2.2 Final - Guidelines On Ensemble Climate Projection Data
November 23, 2016
CliPDaR D2.2 Final - Guidelines On Ensemble Climate Projection Data
CliPDaR_D2.2_final_-_guidelines_on_ensemble_climate_projection_data.pdf
0.6 MiB
267
2-1-Barbara-Vanhooreweder-Noise-Barrier-Report.pdf
May 19, 2017
2-1-Barbara-Vanhooreweder-Noise-Barrier-Report.pdf
2-1-Barbara-Vanhooreweder-Noise-Barrier-Report.pdf
5.1 MiB
265
02 Recypma D2-1 And D2-2- Stateof The Art - Recycling Poymer Modified Asphalt
November 18, 2016
02 Recypma D2-1 And D2-2- Stateof The Art - Recycling Poymer Modified Asphalt
02_recypma_d2-1-and-d2-2-stateof-the-art-recycling-poymer-modified-asphalt.pdf
1.1 MiB
264
AllBack2Pave Article - Page 14
November 24, 2016
AllBack2Pave Article - Page 14
AllBack2Pave-article-page-14.pdf
0.7 MiB
264
2016-12 CEDR CPR Tender
December 21, 2016
2016-12 CEDR CPR Tender
2016-12-CEDR-CPR-tender.pdf
0.5 MiB
264
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Italy - Anas International.pdf
0.5 MiB
262
ITS Position paper April 2014
February 20, 2016
ITS Position paper April 2014
ITS_Position_Paper_April_2014.pdf

CEDR Position paper on EU ITS Action Plan and Directive, European ITS Fora and CEDR

0.2 MiB
262
Enr Design Final Report V6
December 2, 2016
Enr Design Final Report V6
enr_design_final_report_v6_2.pdf
1.3 MiB
261
9c. Welcome to Norway
September 26, 2016
9c. Welcome to Norway
Welcome-to-Norway.docx
0.8 MiB
259
Database Of Adaptation Techniques -
November 23, 2016
Database Of Adaptation Techniques -
Database_of_adaptation_techniques_-_v9.2.xlsm
0.1 MiB
259
SWAMP
November 17, 2016
SWAMP
04_Report-3-The-Blue-Spot-Model.pdf
3.4 MiB
256
01 D1 Rismet
November 25, 2016
01 D1 Rismet
01_D1_Rismet.pdf
0.6 MiB
256
Guideline - Part D Socio-economic impacts analysis (WP3)
November 23, 2016
Guideline - Part D Socio-economic impacts analysis (WP3)
ROADAPT_Part_D_guidelines_on_socioeconomic_impactassessment.pdf
1.1 MiB
254
ToR TRA 2008 Ljubljana
March 8, 2017
ToR TRA 2008 Ljubljana
ToR_TRA_2008_Ljubljana.doc
0.2 MiB
252
www.questback.com ­ print preview
March 11, 2016
www.questback.com ­ print preview
5. Final feedback form S&R Country_Ver 0.1.pdf
0.1 MiB
251
EVITA D2
December 2, 2016
EVITA D2
EVITA-D2.1-Stakeholder’s-categories-and-sub-categories-Expectations-Necessary-and-existing-KPIs
1.2 MiB
251
2-3 Jean-Pierre Clairbois In-situ measurementstocheck the acoustic efficiency
May 19, 2017
2-3 Jean-Pierre Clairbois In-situ measurementstocheck the acoustic efficiency
2-3-Jean-Pierre-Clairbois-In-situ-measurements.pdf
6.4 MiB
251
2- Marc Billiet MBI CEDR6022017
February 8, 2017
2- Marc Billiet MBI CEDR6022017
2-Marc-Billiet_MBI_CEDR6022017.pptx
1.0 MiB
249
6. Recommendation form - sending country 1.0
August 25, 2016
6. Recommendation form - sending country 1.0
9.-Recommendation-form-Sending-country_Ver-1.0.docx
29 KiB
248
Link Project Homepage PHOTHOLE
November 18, 2016
Link Project Homepage PHOTHOLE
Link-Project-Homepage-PHOTHOLE.txt
59 B
248
CEDR Call 2015 Summaries  FLUXNET
January 10, 2017
CEDR Call 2015 Summaries FLUXNET
CEDR_Call_2015_Summaries_-FLUXNET.pdf
93 KiB
247
RECYPMA - D 1.7 TRA2014 RECYPMA Paperv4
November 18, 2016
RECYPMA - D 1.7 TRA2014 RECYPMA Paperv4
RECYPMA-D-1.7-TRA2014_RECYPMA_paperv4.pdf
0.5 MiB
246
08 Liccer D6 Final Report
December 15, 2016
08 Liccer D6 Final Report
08_liccer_d6_final-report.pdf
0.2 MiB
246
AllBack2Pave FinalWorkshop 4
November 24, 2016
AllBack2Pave FinalWorkshop 4
AllBack2Pave_FinalWorkshop_4.pdf
5.8 MiB
245
7. Motivation form - exchange candidate 1.0
October 5, 2016
7. Motivation form - exchange candidate 1.0
7.-Motivation-form-Exchange-candidate_Ver-1.0.docx
29 KiB
243
P2R2C2, Soil Wetting-Drying Study, August 2010
November 17, 2016
3.2 MiB
243
CliPDaR D3.2 Final Report
November 23, 2016
CliPDaR D3.2 Final Report
CliPDaR_D3.2_Final_Report.pdf
3.1 MiB
243
CEDR Call 2015 Summaries FALCON
January 10, 2017
CEDR Call 2015 Summaries FALCON
CEDR-Call-2015_Summaries-FALCON.pdf
0.1 MiB
243
Invitation-NUVit-April-2017.pdf
March 2, 2017
Invitation-NUVit-April-2017.pdf
Invitation-NUVit-April-2017.pdf
3.0 MiB
243
-art, June 2010
November 18, 2016
-art, June 2010
01_ERASER-WP01-Deliverable-01-V12.pdf
1.0 MiB
242
This image cannot currently be displayed.
November 18, 2016
This image cannot currently be displayed.
RECYPMA-D-1.6-Final-Report_management-summary.pdf
1.2 MiB
241
1-3-Steve-Phillips-About-CEDR.pdf
May 19, 2017
1-3-Steve-Phillips-About-CEDR.pdf
1-3-Steve-Phillips-About-CEDR.pdf
4.7 MiB
241
InteMat4PMS
November 18, 2016
InteMat4PMS
02_intemat4pms_deliverable2.pdf
1.3 MiB
240
1-7-Benjamin-Fenech-Valuing-Impacts.pdf
May 19, 2017
1-7-Benjamin-Fenech-Valuing-Impacts.pdf
1-7-Benjamin-Fenech-Valuing-Impacts.pdf
1.2 MiB
240
EVITA D2
December 2, 2016
EVITA D2
EVITA-D2.2-Assessment-and-evaluation-of-existing-KPIs
0.3 MiB
239
1.7 MiB
237
EVITA D4
December 2, 2016
EVITA D4
EVITA-D4.1-Environmental-Indicators-for-the-Total-Road-Infrastructure-Assets
0.2 MiB
235
Asset Management & Maintenance
June 12, 2017
Asset Management & Maintenance
CEDR-Call-2014-Asset-Management-and-Maintenance_Final-conference-Agenda.pdf
0.4 MiB
234
12 ENR SRO3 Project P2R2C2 Deliverable N10
November 17, 2016
12 ENR SRO3 Project P2R2C2 Deliverable N10
12_ENR-SRO3_project-P2R2C2_Deliverable-N10.pdf
0.3 MiB
233
1-4-Colin-Nugent-Exposure to Road Traffic Noise in Europe
May 19, 2017
1-4-Colin-Nugent-Exposure to Road Traffic Noise in Europe
1-4-Colin-Nugent-Traffic-noise-in-Europe.pdf
2.8 MiB
233
8-Bine Pengal Presentation Brussels Pengal
February 8, 2017
8-Bine Pengal Presentation Brussels Pengal
8-Bine-Pengal-Presentation_Brussels_Pengal.pptx
0.9 MiB
230
2-5-Hans-Bendtsen-CEDR-Report-noise-reducing-pavements.pdf
May 19, 2017
2-5-Hans-Bendtsen-CEDR-Report-noise-reducing-pavements.pdf
2-5-Hans-Bendtsen-CEDR-Report-noise-reducing-pavements.pdf
3.9 MiB
228
ASAP Literature All Documents Final
November 23, 2016
ASAP Literature All Documents Final
ASAP_literature_all-documents_final.xlsx
0.2 MiB
227
Decarbonisation of road transport
February 8, 2017
Decarbonisation of road transport
20160314_CEDR-workshop-Electric-Road-Systems_02_Oeko-Institute.pdf
0.8 MiB
226
A – COoperative Benefits for Road Authorities
June 8, 2017
A – COoperative Benefits for Road Authorities
02_cobra-d2-methodology-framework-v1-4-v3.pdf
8.5 MiB
225
ROADAPT Project Description
November 23, 2016
ROADAPT Project Description
cedr-call2012_climate-change_roadapt.pdf
43 KiB
224
1-11-Rasmus-Skov-CBA-noise-reducing-pavements-Denmark.pdf
May 19, 2017
1-11-Rasmus-Skov-CBA-noise-reducing-pavements-Denmark.pdf
1-11-Rasmus-Skov-CBA-noise-reducing-pavements-Denmark.pdf
1.3 MiB
224
Earn D4 Field Aged Results
November 24, 2016
Earn D4 Field Aged Results
earn_d4_field_aged_results.pdf
0.6 MiB
223
1-10-Urs-Walker-CBA-in-Switzerland.pdf
May 19, 2017
1-10-Urs-Walker-CBA-in-Switzerland.pdf
1-10-Urs-Walker-CBA-in-Switzerland.pdf
2.4 MiB
223
06 D6 SPACE  Final Report 120312
November 25, 2016
06 D6 SPACE Final Report 120312
06_D6_SPACE-_final-report_120312.pdf
1.1 MiB
222
ASCAM D7 End Report
December 2, 2016
ASCAM D7 End Report
ASCAM-D7-End-Report.pdf
1.5 MiB
222
Identified Correlations Between Bitumen And Asphalt Properties (D1.1)
June 29, 2017
Identified Correlations Between Bitumen And Asphalt Properties (D1.1)
D.1-Identified-correlations-between-bitumen-and-asphalt-properties.pdf
34.6 MiB
220
2-4-Marcocci-Sebastien-Management-of-noise-barriers.pdf
May 19, 2017
2-4-Marcocci-Sebastien-Management-of-noise-barriers.pdf
2-4-Marcocci-Sebastien-Management-of-noise-barriers.pdf
2.1 MiB
212
03 Cereal D3 Tool Assessment
December 14, 2016
03 Cereal D3 Tool Assessment
03_cereal_d3_tool-assessment.pdf
0.2 MiB
208
1-5-Mette-Sorensen-Health effects of road
May 19, 2017
1-5-Mette-Sorensen-Health effects of road
1-5-Mette-Sorensen-Health-Effects.pdf
1.7 MiB
208
2-2-Giles-Parker-Solar-Noise-Barriers.pdf
May 19, 2017
2-2-Giles-Parker-Solar-Noise-Barriers.pdf
2-2-Giles-Parker-Solar-Noise-Barriers.pdf
3.5 MiB
207
D4.1-Activity-of-RA-bitumen-in-cold-recycled-mixes
November 22, 2016
D4.1-Activity-of-RA-bitumen-in-cold-recycled-mixes
D4.1-Activity-of-RA-bitumen-in-cold-recycled-mixes.pdf
2.0 MiB
206
ROADAPT Brochure
November 23, 2016
ROADAPT Brochure
ROADAPT_-_brochure.pdf
0.8 MiB
204
CR 2017-06_Call 2014 Mobility and ITS End of Programme Report
December 5, 2017
CR 2017-06_Call 2014 Mobility and ITS End of Programme Report
CEDR-Contractor-Report-2017-06_Call-2014-Mobility-Final-Conference-and-Programme-Report.pdf
1.7 MiB
203
3.2 MiB
202
07 ENR Deliverable 6.3d08 Final Version
November 25, 2016
07 ENR Deliverable 6.3d08 Final Version
07_ENR_Deliverable_6.3d08_final_version.pdf
4.3 MiB
202
3.1 MiB
201
Guideline – Part C: GIS-aided vulnerability assessment for roads – Existing methods and new suggestions
November 23, 2016
2.6 MiB
200
00 Enr Road - Mobility Final Report
December 2, 2016
00 Enr Road - Mobility Final Report
00_enr-road-mobility_final-report.pdf
0.8 MiB
200
QuickScan – A24 Portugal March 2014
November 23, 2016
QuickScan – A24 Portugal March 2014
ROADAPT_case_study_A24_Portugal_Quickscan_report.pdf
0.4 MiB
199
5-Kit McDonald-Jason Hansell CEDRUKHomeofficeBorderforcefeb17 (1)
February 8, 2017
5-Kit McDonald-Jason Hansell CEDRUKHomeofficeBorderforcefeb17 (1)
5-Kit-McDonald-Jason-Hansell-CEDRUKHomeofficeBorderforcefeb17-1.ppt
1.0 MiB
199
Initial Review of Technologies (D1.1)
June 29, 2017
Initial Review of Technologies (D1.1)
D1.1-catalogue_of_energy_reducing_options_v1_0.pdf
2.4 MiB
199
Workshop on ElectricRoads
February 8, 2017
Workshop on ElectricRoads
20160314_CEDR-workshop-Electric-Road-Systems_04_German-Federal-Highway-Research-Institute.pdf
1.3 MiB
198
CR 2017-04_Call 2013 Traffic Management of End of Programme Report
December 5, 2017
CR 2017-04_Call 2013 Traffic Management of End of Programme Report
CEDR-Contractor-Report-2017-04_Call-2013-Traffic-Management-End-of-Programme-Report.pdf
1.6 MiB
198
Das Bild kann zurzeit nicht angezeigt werden.
June 8, 2017
Das Bild kann zurzeit nicht angezeigt werden.
03_seamless_3rd-deliverable_02-00-00.pdf
6.7 MiB
197
POTHOLE
November 18, 2016
POTHOLE
04_pothole-d5-annex-guidelines.pdf
4.9 MiB
196
TRA2010 Second announcement
March 8, 2017
TRA2010 Second announcement
TRA2010-2nd-ANNOUNCEMENT.pdf
1.5 MiB
196
2-7-Rasmus-Skov-Tendering-noise-reducing-pavements-in-Denmark.pdf
May 19, 2017
2-7-Rasmus-Skov-Tendering-noise-reducing-pavements-in-Denmark.pdf
2-7-Rasmus-Skov-Tendering-noise-reducing-pavements-in-Denmark.pdf
1.2 MiB
196
A Cooperative Benefits for Road
June 8, 2017
A Cooperative Benefits for Road
04a_cobra-d4-1-cost-benefit-analysis-v0-7.pdf
1.4 MiB
196
CEDR Call 2015 Summaries DETECTOR
January 10, 2017
CEDR Call 2015 Summaries DETECTOR
CEDR-Call-2015_Summaries-DETECTOR.pdf
94 KiB
195
IRDES
November 18, 2016
IRDES
02_IRDES_D1_State-of-the-art-report_V3.0_31.01.pdf
2.0 MiB
192
CEDR Call 2012: Recycling: Road construction in a post-fossil fuel society
November 15, 2016
CEDR Call 2012: Recycling: Road construction in a post-fossil fuel society
D2.1-Durability-of-cold-recycled-mixes-–-Test-procedures-for-ageing.pdf
0.7 MiB
191
EXPECT D3  Report Describing Tools To Evaluate And Prioritise Different Stakeholder Requirements
December 2, 2016
EXPECT D3 Report Describing Tools To Evaluate And Prioritise Different Stakeholder Requirements
EXPECT-D3.-Report-describing-tools-to-evaluate-and-prioritise-different-stakeholder-requirements.pdf
0.8 MiB
191
2013 Asset Management - Technical Report
December 2, 2016
2013 Asset Management - Technical Report
2013-Asset-management-Technical-report.pdf
0.9 MiB
191
CEDR Call 2015 Summaries WATCH
December 15, 2016
CEDR Call 2015 Summaries WATCH
CEDR-Call-2015_Summaries-WATCH.pdf
0.1 MiB
191
1-9-Renez-Nota-CEA-in-Netherlands.pdf
May 19, 2017
1-9-Renez-Nota-CEA-in-Netherlands.pdf
1-9-Renez-Nota-CEA-in-Netherlands.pdf
0.9 MiB
191
07 20100917 Case Study A2-A58 Netherlands Final Draft
November 17, 2016
07 20100917 Case Study A2-A58 Netherlands Final Draft
07_20100917-Case-study-A2-A58-Netherlands-final-draft.pdf
4.6 MiB
190
05 ENR SRO3 Project P2R2C2 Deliverable N2
November 17, 2016
05 ENR SRO3 Project P2R2C2 Deliverable N2
05_ENR-SRO3_project-P2R2C2_Deliverable-N2.pdf
0.8 MiB
190
TRA2008 Wrap-up report
March 8, 2017
TRA2008 Wrap-up report
TRA_2008_Wrap_Up_Report.pdf
0.5 MiB
190
Invitation letter TRA2008
March 8, 2017
Invitation letter TRA2008
Invitation_letter_TRA_2008.pdf
95 KiB
189
ASCAM D2 Inventory Pavement Management Practices
December 2, 2016
ASCAM D2 Inventory Pavement Management Practices
ASCAM-D2-Inventory-Pavement-Management-practices.pdf
0.6 MiB
188
ASCAM D3 - Asset Service Condition Assessment Methodology
December 2, 2016
2.6 MiB
188
Pre-announcement
March 1, 2017
Pre-announcement
leaflet-final.pdf
0.4 MiB
188
ERA NET Road                                                                      National University of Ireland Maynooth
November 18, 2016
ERA NET Road National University of Ireland Maynooth
04_EuRSI_Budapest_4Mar10_website.pdf
6.8 MiB
187
01 AllBack2Pave TRA2014 Poster
November 24, 2016
01 AllBack2Pave TRA2014 Poster
01_AllBack2Pave_TRA2014_Poster.pdf
0.1 MiB
187
. Principles for a European Road OTL
November 10, 2017
. Principles for a European Road OTL
INTERLINK-D4-Principles_EuropeanRoadOTL.PDF
3.0 MiB
187
Climate data requirements of National Road Authorities for the current and future climate - Report: Part A, No. 2
November 23, 2016
Climate data requirements of National Road Authorities for the current and future climate - Report: Part A, No. 2
ROADAPT_Part_A2_-_Climate_data_requirements_of_national_road_authorities.pdf
0.7 MiB
186
D5.1-Environmental-Evaluation-of-Materials-Used-for-Cold-Recycled-Mixes
November 22, 2016
D5.1-Environmental-Evaluation-of-Materials-Used-for-Cold-Recycled-Mixes
D5.1-Environmental-Evaluation-of-Materials-Used-for-Cold-Recycled-Mixes.pdf
2.3 MiB
186
AllBack2Pave End User Manual
November 24, 2016
AllBack2Pave End User Manual
AllBack2Pave_End-User-Manual.pdf
3.1 MiB
186
RECYPMA
November 18, 2016
RECYPMA
03_recypma-deliverable-3.1properties-binder.pdf
5.0 MiB
185
Earn D7 Moisture Damage Susceptability
November 24, 2016
Earn D7 Moisture Damage Susceptability
earn_d7_moisture_damage_susceptability.pdf
1.3 MiB
185
03 SPACE Deliverable3 Final 13052011[1]
November 25, 2016
03 SPACE Deliverable3 Final 13052011[1]
03_SPACE_Deliverable3_Final_130520111.pdf
3.3 MiB
185
Invitation WATCH Workshop CEDR Call 2015 Climate Change - Roads Water Management In The Face Of Climate Change
January 4, 2017
Invitation WATCH Workshop CEDR Call 2015 Climate Change - Roads Water Management In The Face Of Climate Change
Invitation-WATCH-workshop-CEDR-Call-2015-Climate-Change-Roads-water-management-in-the-face-of-climate-change.pdf
0.2 MiB
184
1-8-Stefan-Grudemo-Pricing-in-Sweden.pdf
May 19, 2017
1-8-Stefan-Grudemo-Pricing-in-Sweden.pdf
1-8-Stefan-Grudemo-Pricing-in-Sweden.pdf
0.4 MiB
184
Combined WPA & WPB Report
June 23, 2017
Combined WPA & WPB Report
INTERLINK-D.2-D.3-WPA-WPB-Report-Final-Issue.pdf
5.7 MiB
184
CR 2018-3 Call 2013 Roads And Wildlife Manual
June 1, 2018
CR 2018-3 Call 2013 Roads And Wildlife Manual
CR-2018-3-Call-2013-Roads-and-Wildlife-Manual.pdf

CEDR commissioned the ECOROAD project to produce this Roads and Wildlife Manual which complements the work of COST 341 and integrates the “Harmony”, “SAFEROAD” and “SafeBatPaths” projects together with further input from European road ecology experts. The aim is to update COST 341 to reflect changes such as those in European Union legislation and policy. The manual also identifies best practice in areas such as procurement, maintenance and monitoring.

4.5 MiB
184
2-9-Wiebe-Alberts-Follow-up-actions.pdf
May 19, 2017
2-9-Wiebe-Alberts-Follow-up-actions.pdf
2-9-Wiebe-Alberts-Follow-up-actions.pdf
0.3 MiB
183
8 CENTRO TECNOLOGICO AUTOMOCION GALICIA
October 9, 2017
8 CENTRO TECNOLOGICO AUTOMOCION GALICIA
8_CENTRO-TECNOLOGICO-AUTOMOCION-GALICIA.pdf
6.4 MiB
183
D2.1-Durability-of-cold-recycled-mixes-%E2%80%93-Test-procedures-for-moisture-susceptibility
November 22, 2016
D2.1-Durability-of-cold-recycled-mixes-%E2%80%93-Test-procedures-for-moisture-susceptibility
D2.1-Durability-of-cold-recycled-mixes-–-Test-procedures-for-moisture-susceptibility.pdf
1.0 MiB
181
02 RISMET-Del.2-Data-systems-and-requirements 08-02-2011 Kfv Final
November 25, 2016
02 RISMET-Del.2-Data-systems-and-requirements 08-02-2011 Kfv Final
02_RISMET-Del.2-Data-systems-and-requirements_08-02-2011_kfv_final.pdf
2.7 MiB
181
1-1-Gert-Ahe-Intro.pdf
May 19, 2017
1-1-Gert-Ahe-Intro.pdf
1-1-Gert-Ahe-Intro.pdf
1.0 MiB
181
D1.2 Final Annex C
November 23, 2016
D1.2 Final Annex C
CliPDaR_D1.2_final_Annex_C.pdf
6.8 MiB
180
AllBack2Pave FinalWorkshop 1
November 24, 2016
AllBack2Pave FinalWorkshop 1
AllBack2Pave_FinalWorkshop_1.pdf
2.4 MiB
179
R Workshop on Electric Road Systems
February 8, 2017
R Workshop on Electric Road Systems
20160314_CEDR-workshop-Electric-Road-Systems_01_Siemens.pdf
2.0 MiB
178
TRA2010 Brochure
March 8, 2017
TRA2010 Brochure
Brochure-TRA-DEF.pdf
2.8 MiB
178
Earn D8 Site Trials
November 24, 2016
Earn D8 Site Trials
earn_d8_site_trials.pdf
1.0 MiB
177
CEDR BRoWSER D7 1 -Standards And Guidance Report - April 2015
November 24, 2016
CEDR BRoWSER D7 1 -Standards And Guidance Report - April 2015
CEDR-BRoWSER-D7_1-Standards-and-guidance-report-April-2015.pdf
5.7 MiB
177
SWAMP
November 17, 2016
SWAMP
02_Report1-Summary-Report.pdf
1.9 MiB
176
03 ERASER WP034 Deliverable Final
November 18, 2016
03 ERASER WP034 Deliverable Final
03_ERASER-WP034-Deliverable_Final.pdf
2.4 MiB
176
D2.1 Durability Of Cold-recycled Mixes – Test Procedures For Moisture Stiffness Determination
November 15, 2016
D2.1 Durability Of Cold-recycled Mixes – Test Procedures For Moisture Stiffness Determination
D2.1-Durability-of-cold-recycled-mixes-–-Test-procedures-for-moisture-stiffness-determination.pdf
2.3 MiB
175
How will freight
February 8, 2017
How will freight
20160314_CEDR-workshop-Electric-Road-Systems_05_Swedish-Transport-Administration.pdf
1.1 MiB
175
RECYPMA
November 18, 2016
RECYPMA
05_121211-recypma-peb-meeting-dec-2012.pdf
1.6 MiB
174
RECYPMA - D 1.8
November 18, 2016
RECYPMA - D 1.8
RECYPMA-D-1.8.ppt
2.9 MiB
172
TRA2018 Schedule Of CEDR Project Presentations (formal And CEDR Exhibition Area)
April 13, 2018
TRA2018 Schedule Of CEDR Project Presentations (formal And CEDR Exhibition Area)
TRA2018_Schedule-of-CEDR-Project-presentations-formal-and-CEDR-exhibition-area_2.pdf
0.2 MiB
171
RIMAROCC
November 17, 2016
RIMAROCC
06_Network-case-study-Final-Draft.pdf
1.0 MiB
170
P2R2C2
November 17, 2016
P2R2C2
10_Deliverable-N7.pdf
1.2 MiB
169
08 Report Case Study Väja Final Draft Pdf Onwjcwx
November 17, 2016
08 Report Case Study Väja Final Draft Pdf Onwjcwx
08_Report-Case-study-Väja-Final-Draft_pdf.onwjcwx.partial
0 B
169
01 Mobi-roma D1 State-of-the-art
November 18, 2016
01 Mobi-roma D1 State-of-the-art
01_mobi-roma_d1-state-of-the-art.pdf
1.4 MiB
169
tneaSPMI
November 18, 2016
tneaSPMI
04_intemat4pms_deliverable4.pdf
1.5 MiB
168
D1.1-Report-on-available-test-and-mix-design-procedures-for-cold-recycled-bitumen-stabilised-materials
November 22, 2016
D1.1-Report-on-available-test-and-mix-design-procedures-for-cold-recycled-bitumen-stabilised-materials
D1.1-Report-on-available-test-and-mix-design-procedures-for-cold-recycled-bitumen-stabilised-materials.pdf
2.4 MiB
167
ASCAM R6 EN Final
December 2, 2016
ASCAM R6 EN Final
ASCAM-R6-EN-final.ppt
6.9 MiB
167
04 Final Report Cereal 2014
December 14, 2016
04 Final Report Cereal 2014
04_final-report-cereal-2014.pdf
0.6 MiB
167
zyxwvutsrqponmlkjihgfedcbaUTSRPONMLIHGFEDCBA
November 18, 2016
zyxwvutsrqponmlkjihgfedcbaUTSRPONMLIHGFEDCBA
03_intemat4pms_deliverable3.pdf
1.0 MiB
165
D2.1-Durability-of-cold-recycled-mixes-%E2%80%93-Test-procedures-for-moisture-stiffness-determination
November 22, 2016
D2.1-Durability-of-cold-recycled-mixes-%E2%80%93-Test-procedures-for-moisture-stiffness-determination
D2.1-Durability-of-cold-recycled-mixes-–-Test-procedures-for-moisture-stiffness-determination.pdf
2.3 MiB
164
CEDR BRoWSER Final Trial Report - October 2014
November 24, 2016
CEDR BRoWSER Final Trial Report - October 2014
CEDR-BRoWSER-Final-Trial-Report-October-2014.pdf
0.5 MiB
164
08 ENR SRO1 SPACE
November 25, 2016
08 ENR SRO1 SPACE
08_ENR-SRO1_SPACE.pdf
1.1 MiB
164
X-ARA Project Description
June 26, 2017
0.2 MiB
163
ERA NET Road                                                                                                    EuRSI Project Partners
November 18, 2016
ERA NET Road EuRSI Project Partners
05_EuRSI_6thAug2010_website.pdf
3.0 MiB
162
01 ENR SRO1 D1 SPACE WP 1 And 2 Deliverable Website
November 25, 2016
01 ENR SRO1 D1 SPACE WP 1 And 2 Deliverable Website
01_ENR-SRO1_D1_SPACE-WP-1-and-2-deliverable_website.pdf
1.7 MiB
162
06 Cereal Project
December 14, 2016
06 Cereal Project
06_cereal_project.pdf
0.4 MiB
162
R Workshop on Electric Road Systems
February 8, 2017
R Workshop on Electric Road Systems
20160314_CEDR-workshop-Electric-Road-Systems_07_Siemens.pdf
0.5 MiB
162
1-2-Wiebe-Alberts-scope-and-objectives.pdf
May 19, 2017
1-2-Wiebe-Alberts-scope-and-objectives.pdf
1-2-Wiebe-Alberts-scope-and-objectives.pdf
0.4 MiB
160
ERASER
November 18, 2016
ERASER
05_ENR-SRO1_project-ERASER_Joint-Meeting-Presentations_040310.pdf
1.5 MiB
159
Re-Gen Project Description
June 26, 2017
0.3 MiB
159
D2.1 Report on Durability of cold-recycled mixes: Test procedures for simulating long-term ageing
November 22, 2016
D2.1 Report on Durability of cold-recycled mixes: Test procedures for simulating long-term ageing
D2.1-Durability-of-cold-recycled-mixes-–-Test-procedures-for-ageing.pdf
0.7 MiB
158
AllBack2Pave FinalWorkshop 3
November 24, 2016
AllBack2Pave FinalWorkshop 3
AllBack2Pave_FinalWorkshop_3.pdf
3.0 MiB
158
Road Owners Getting to Grips with Climate Change
November 17, 2016
Road Owners Getting to Grips with Climate Change
00_ENR-Final-ReportRoad-Owners-Getting-to-Grips.pdf
0.4 MiB
156
RECYPMA - D 2.1 State Of The Art-recycling Pma
November 18, 2016
RECYPMA - D 2.1 State Of The Art-recycling Pma
RECYPMA-D-2.1-State-of-the-Art-recycling-pma.pdf
1.1 MiB
155
CEDR Call 2015 Summaries ISAAC
January 10, 2017
CEDR Call 2015 Summaries ISAAC
CEDR_Call_2015_Summaries_ISAAC.pdf
92 KiB
155
06 ENR SRO3 Project P2R2C2 Deliverable N3
November 17, 2016
06 ENR SRO3 Project P2R2C2 Deliverable N3
06_ENR-SRO3_project-P2R2C2_Deliverable-N3.pdf
0.8 MiB
154
05 IRDES Final Report WP4 1
November 18, 2016
05 IRDES Final Report WP4 1
05_IRDES_Final-Report-WP4_1.pdf
7.1 MiB
153
ASAP D4 1 Speed management at Work Zone - Field studies and stakeholder’s survey
November 23, 2016
ASAP D4 1 Speed management at Work Zone - Field studies and stakeholder’s survey
ASAP_D4-1_PracticalInfofromFieldStudiesStakeholderSurv_FinalDraft_v2312am.pdf
8.3 MiB
153
05 RismetDeliverable6.1final
November 25, 2016
05 RismetDeliverable6.1final
05_RismetDeliverable6.1final.pdf
7.8 MiB
153
EUSight_D8_Final_report
June 26, 2017
EUSight_D8_Final_report
Eusight_D8_Final_report.pdf
2.1 MiB
153
IRDES
November 18, 2016
IRDES
03_IRDES_WP2_DeliverableD2_v2_111222.pdf
2.9 MiB
152
D2.1 Data requirements for future noise mapping and action planning
November 24, 2016
D2.1 Data requirements for future noise mapping and action planning
DISTANCE-SINTEF-D21-V01-07102015-Data-requirements-for-future-noise-mapping-and-action-planning.pdf
0.4 MiB
152
CEDR Call 2015 Summaries STTRIDE
January 10, 2017
CEDR Call 2015 Summaries STTRIDE
CEDR_Call_2015_Summaries_STTRIDE.pdf
94 KiB
152
D5.2 Final report on optimization of management strategies under different traffic climate change and financial scenarios
June 26, 2017
D5.2 Final report on optimization of management strategies under different traffic climate change and financial scenarios
D5.2-Final-report-on-optimization-of-management-strategies-under-different-traffic-climate-change-and-financial-scenarios.pdf
0.9 MiB
152
CEDR BRoWSER Baseline Report (D3.1 & 3.2 & 6.1)
November 24, 2016
CEDR BRoWSER Baseline Report (D3.1 & 3.2 & 6.1)
CEDR-BRoWSER-Baseline-Report-October-2014.pdf
3.4 MiB
151
Seamless traffic data dissemination across
June 8, 2017
Seamless traffic data dissemination across
06_seamless-27.09.2013_presentation_vienna_01-00-00.pdf
5.4 MiB
151
03 Miravec D2.1
January 12, 2018
03 Miravec D2.1
03_miravec_d2.1_v5.0.pdf
0.9 MiB
151
European Road Safety Inspection (EuRSI) zyxwvutsrqponmlkjihgfedcbaZYXWVUTSRQPONMLKJIHGFEDCBA
November 18, 2016
2.0 MiB
149
2013 Asset Management - Social Benefit Report
December 2, 2016
2013 Asset Management - Social Benefit Report
2013-Asset-management-Social-benefit-report.pdf
1.5 MiB
149
- Implementation and User Guidance Document Risk tool X-ARA (D4.2)
June 26, 2017
- Implementation and User Guidance Document Risk tool X-ARA (D4.2)
CEDR-Call-2013_X-ARA_D4.2-User-guidance-document-Risk-tool-X-ARA_final.pdf
2.0 MiB
149
00 ENR SRO1 Project ERASER
November 18, 2016
00 ENR SRO1 Project ERASER
00_ENR-SRO1_project-ERASER.pdf
23 KiB
148
10 ENR SRO1 RISMET
November 25, 2016
10 ENR SRO1 RISMET
10_ENR-SRO1_RISMET.pdf
0.4 MiB
148
6-Rik Dhoest - DAH Migrants Jan17
February 8, 2017
6-Rik Dhoest - DAH Migrants Jan17
6-Rik-Dhoest-DAH-migrants-jan17.ppt
1.7 MiB
148
ASCAM Project
November 18, 2016
ASCAM Project
01_ENR-SRO4_ASCAM_Description.pdf
94 KiB
147
AllBack2Pave Mix Design
November 24, 2016
AllBack2Pave Mix Design
AllBack2Pave_Mix-Design.pdf
3.4 MiB
147
Call 2014: Asset Management and Maintenance
April 13, 2017
Call 2014: Asset Management and Maintenance
Workshop_ISABELA_20170531.pdf
0.4 MiB
147
A – COoperative Benefits for Road Authorities
June 8, 2017
A – COoperative Benefits for Road Authorities
01_cobra_d1-report-with-overview-of-developments-of-cs-including-legal-issues.pdf
1.9 MiB
147
01 ENR SRO3 IRWIN D1 First Inception Report V1
November 15, 2016
01 ENR SRO3 IRWIN D1 First Inception Report V1
01_ENR_SRO3_IRWIN_D1_First-inception-report-V1.pdf
1.0 MiB
145
Durable Pothole Repairs -
November 18, 2016
Durable Pothole Repairs -
06_neu-enr-design-peb-meeting-pothole.pdf
2.1 MiB
144
Annex C - Schemes of layouts
November 23, 2016
Annex C - Schemes of layouts
Annex-C_Schemes-of-layouts.pdf
1.6 MiB
144
Earn D5 Modelling
November 24, 2016
Earn D5 Modelling
earn_d5_modelling.pdf
1.4 MiB
144
P2R2C2 – Climate Change Projections, April 2010
November 17, 2016
2.2 MiB
143
ASCAM D4 Inventory Road Equipment Management Practices
December 2, 2016
ASCAM D4 Inventory Road Equipment Management Practices
ASCAM-D4-Inventory-Road-Equipment-Management-practices.pdf
0.6 MiB
142
CEDR BRoWSER Database Specification And Design - December 2014
November 24, 2016
CEDR BRoWSER Database Specification And Design - December 2014
CEDR-BRoWSER-Database-specification-and-design-December-2014.pdf
0.6 MiB
141
Deliverable F Preliminary Maintenance Report Part A Ecological Functions Of Roads
June 29, 2017
Deliverable F Preliminary Maintenance Report Part A Ecological Functions Of Roads
Deliverable-F_Preliminary-Maintenance-Report_Part-A_Ecological-Functions-of-Roads.pdf
0.7 MiB
141
P Short Term Prediction
June 8, 2017
P Short Term Prediction
01_step_d2-from-wp2-report-on-customer-requirements.pdf
1.9 MiB
140
03 ENR SRO3 Project P2R2C2 Final Report
November 17, 2016
03 ENR SRO3 Project P2R2C2 Final Report
03_ENR-SRO3_project-P2R2C2_final_report.pdf
0.6 MiB
139
Safety at the Heart of Road Design
November 18, 2016
Safety at the Heart of Road Design
09_ENR-SRO1_IRDES.pdf
5.5 MiB
139
ASCAM D1 Framework Concepts, Variables, Relationships, Assumptions And Limitations
December 2, 2016
ASCAM D1 Framework Concepts, Variables, Relationships, Assumptions And Limitations
ASCAM-D1-Framework-concepts-variables-relationships-assumptions-and-limitations.pdf
1.6 MiB
139
Earn D6 Decision Model
November 24, 2016
Earn D6 Decision Model
earn_d6_decision_model.pdf
73 KiB
139
Registration Form
March 1, 2017
Registration Form
Registration-form-final.docx
31 KiB
139
08 ENR SRO1 Project IRDES Joint Meeting Presentations 040310
November 18, 2016
08 ENR SRO1 Project IRDES Joint Meeting Presentations 040310
08_ENR-SRO1_project-IRDES_Joint-Meeting-Presentations_040310.pdf
2.7 MiB
138
08 RismetDeliverable7final
November 25, 2016
08 RismetDeliverable7final
08_RismetDeliverable7final.pdf
2.6 MiB
138
01 Stars D1-generic-data-requirements-and-scoring-template-specification
November 18, 2016
01 Stars D1-generic-data-requirements-and-scoring-template-specification
01_stars_d1-generic-data-requirements-and-scoring-template-specification.pdf
0.7 MiB
137
02 Stars - D2 Data Requirements
December 2, 2016
02 Stars - D2 Data Requirements
02_stars-d2_data-requirements.pdf
1.9 MiB
137
RIMAROCC
November 17, 2016
RIMAROCC
04_RIMAROCC_D1_State.pdf
0.5 MiB
136
D4.2 Report on recyclability and multiple recyclability of cold-recycled asphalt mixes in cold and hot recycling
November 22, 2016
D4.2 Report on recyclability and multiple recyclability of cold-recycled asphalt mixes in cold and hot recycling
D4.2-Recyclability-and-multiple-recyclability-of-cold-recycled-asphalt-mixes-in-cold-and-hot-recycling.pdf
2.4 MiB
136
3.2 MiB
136
ENR2011 DESIGN InteMat4PMS Project Description
November 18, 2016
ENR2011 DESIGN InteMat4PMS Project Description
00_enr2011-design-project-description-intemat4pms.pdf
29 KiB
135
D3 Experience of Speed Management in Practise
November 23, 2016
D3 Experience of Speed Management in Practise
D3_1_Experience-of-Speed-Management_final.pdf
2.8 MiB
135
EVITA D3.1 Report On Recommended E-KPIs
December 2, 2016
EVITA D3.1 Report On Recommended E-KPIs
EVITA-D3.1-Report-on-recommended-E-KPIs.pdf
1.1 MiB
135
D2 CONSISTEND The Tool
June 29, 2017
D2 CONSISTEND The Tool
D2_CONSISTEND_The_tool.pdf
2.6 MiB
135
MOBI-ROMA
November 18, 2016
MOBI-ROMA
03_mobi-roma_d3-development-of-gui.pdf
2.3 MiB
134
Annex A Data Collection
November 23, 2016
Annex A Data Collection
Annex-A_Data-collection.pdf
4.2 MiB
134
3.5 MiB
134
9a ENG PRESENTACION MEXICO SEGURIDAD VIAL VERSION CORTA Inglés
October 18, 2017
9a ENG PRESENTACION MEXICO SEGURIDAD VIAL VERSION CORTA Inglés
PRESENTACION-MEXICO-SEGURIDAD-VIAL-VERSION-CORTA-Inglés.pptx
4.1 MiB
134
04 ENR SRO3 Project P2R2C2 Deliverable N1
November 17, 2016
04 ENR SRO3 Project P2R2C2 Deliverable N1
04_ENR-SRO3_project-P2R2C2_Deliverable-N1.pdf
1.6 MiB
133
CEDR BRoWSER Input Data Definition - March 2014
November 24, 2016
CEDR BRoWSER Input Data Definition - March 2014
CEDR-BRoWSER-Input-data-definition-March-2014.pdf
2.5 MiB
133
ASAP D4 1 Appendix1 BRNO - PRAHA 3
November 23, 2016
ASAP D4 1 Appendix1 BRNO - PRAHA 3
ASAP_D4-1_Appendix1_BRNO-PRAHA-3.pdf
3.4 MiB
132
CEDR BRoWSER Presentation At TRA2014
November 24, 2016
CEDR BRoWSER Presentation At TRA2014
CEDR-BRoWSER-Presentation-at-TRA2014.pdf
0.6 MiB
132
06 RISMETdeliverable6 2
November 25, 2016
06 RISMETdeliverable6 2
06_RISMETdeliverable6_2.pdf
1.9 MiB
132
00 ENR SRO1 Project SPACE
November 25, 2016
00 ENR SRO1 Project SPACE
00_ENR-SRO1_project-SPACE.pdf
32 KiB
132
04 Rismetdeliverable4and5
November 25, 2016
04 Rismetdeliverable4and5
04_Rismetdeliverable4and5.pdf
1.1 MiB
131
RECYPMA
November 18, 2016
RECYPMA
RECYPMA-D-3.1-properties-binder_-Final.pdf
4.9 MiB
130
CEDR BRoWSER D5 1 - Database Specification And Design - February 2015 Visualisation Update
November 24, 2016
CEDR BRoWSER D5 1 - Database Specification And Design - February 2015 Visualisation Update
CEDR-BRoWSER-D5_1-Database-specification-and-design-February-2015-Visualisation-update.pdf
0.8 MiB
130
EVITA Project
November 18, 2016
EVITA Project
02_ENR-SRO4_EVITA_-Description.pdf
25 KiB
129
N STARS Project Description
November 18, 2016
N STARS Project Description
00_enr2011-design-project-description-stars.pdf
0.2 MiB
129
D4.2 Future Potential Traffic Scenarios
November 24, 2016
D4.2 Future Potential Traffic Scenarios
DISTANCE-TRL-D42-V01-15072015-Future-potential-traffic-scenarios.pdf
0.5 MiB
129
Call 2009 Safety At The Heart Of Road Design Final Report
November 25, 2016
Call 2009 Safety At The Heart Of Road Design Final Report
Call-2009-Safety-at-the-Heart-of-Road-Design_Final-Report.pdf
1.1 MiB
129
Report Rimarocc
November 17, 2016
Report Rimarocc
05_ENRA-NET-Monitoring-Progress-Report-3-RIMAROCC-v-1.0website.pdf
0.3 MiB
128
ASAP D4 1 Appendix1 BRNO - PRAHA 2
November 23, 2016
ASAP D4 1 Appendix1 BRNO - PRAHA 2
ASAP_D4-1_Appendix1_BRNO-PRAHA-2.pdf
3.3 MiB
128
12_BID-SV-infraestructura-y-vehiculos
October 9, 2017
12_BID-SV-infraestructura-y-vehiculos
12_BID-SV-infraestructura-y-vehiculos-.pdf
4.6 MiB
128
Research on Low Carbon EmissionsLow Carbon Emissions
February 8, 2017
Research on Low Carbon EmissionsLow Carbon Emissions
20160314_CEDR-workshop-Electric-Road-Systems_06_Norwegian-Public-Road-Administration.pdf
0.5 MiB
127
CLiPDaR Project Description
November 23, 2016
CLiPDaR Project Description
cedr-call2012_climate-change_clipdar.pdf
36 KiB
126
5.4 MiB
125
D7.1 Developing Innovative Solutions for Traffic Noise Control in Europe
November 24, 2016
D7.1 Developing Innovative Solutions for Traffic Noise Control in Europe
DISTANCE-BRRC-D71-V01-11012016-Policy-brief.pdf
0.4 MiB
124
D6.1 Perception and awareness of noise mitigation measures
November 24, 2016
D6.1 Perception and awareness of noise mitigation measures
DISTANCE-SINTEF-D61-V01-15072015-Perception-and-awareness-of-noise-mitigation-measures.pdf
1.6 MiB
124
Project Description
November 17, 2016
Project Description
00_ENR-SRO3_project-RIMAROCC.pdf
29 KiB
123
D3.2 Review of the most critical existing structures under growing traffic and advice for precise assessment
June 26, 2017
D3.2 Review of the most critical existing structures under growing traffic and advice for precise assessment
D3.2-Review-of-the-most-critical-existing-structures-under-growing-traffic-and-advice-for-precise-assessment.pdf
5.6 MiB
123
01 ENR SRO3 Project P2R2C2 Brochure
November 15, 2016
01 ENR SRO3 Project P2R2C2 Brochure
01_ENR-SRO3_project-P2R2C2_Brochure.pdf
2.8 MiB
122
03 AllBack2Pave DtStrassenUndVerkehrskongress2014 Poster
November 24, 2016
03 AllBack2Pave DtStrassenUndVerkehrskongress2014 Poster
03_AllBack2Pave_DtStrassenUndVerkehrskongress2014_Poster.pdf
0.2 MiB
122
Earn D9 Final Report
November 24, 2016
Earn D9 Final Report
earn_d9_final_report.pdf
2.0 MiB
122
ASCAM D5b ASCAM Demonstrator User Guide
December 2, 2016
ASCAM D5b ASCAM Demonstrator User Guide
ASCAM-D5b-ASCAM-demonstrator-User-Guide.pdf
1.2 MiB
122
SiFiE
June 23, 2017
SiFiE
cedr_mobility_MAASiFiE_deliverable_3_revised_final.pdf
3.7 MiB
122
HEROAD
November 18, 2016
HEROAD
04_ENR-SRO4_HEROAD_-Description.pdf
33 KiB
121
00 Enr2011 Energy Project Description Liccer
December 14, 2016
00 Enr2011 Energy Project Description Liccer
00_enr2011-energy-project-description-liccer.pdf
48 KiB
121
A – COoperative Benefits for Road Authorities
June 8, 2017
A – COoperative Benefits for Road Authorities
05_cobra-d5-conclusions-and-recommendations.pdf
4.9 MiB
121
Recommended Product Category Rules (PCRs) For Bituminous Materials And Technologies (D2-1)
June 28, 2017
Recommended Product Category Rules (PCRs) For Bituminous Materials And Technologies (D2-1)
Recommended-Product-Category-Rules-PCRs-for-bituminous-materials-and-technologies-D2-1.pdf
2.0 MiB
121
ERAnet-Road-Project
November 18, 2016
ERAnet-Road-Project
06_20121211-intemat4pms-vers2.pdf
0.7 MiB
120
D3.1 Guidelines On Collecting WIM Data And Forecasting Of Traffic Load Effects On Bridges
June 26, 2017
D3.1 Guidelines On Collecting WIM Data And Forecasting Of Traffic Load Effects On Bridges
D3.1-Guidelines-on-collecting-WIM-data-and-forecasting-of-traffic-load-effects-on-bridges.pdf
4.7 MiB
120
05 ENR SRO3 Project IRWIN Seminar 17 Nov 2009 Helsinki Foreca
November 17, 2016
05 ENR SRO3 Project IRWIN Seminar 17 Nov 2009 Helsinki Foreca
05_ENR-SRO3_project_IRWIN_Seminar_17_Nov_2009_Helsinki_Foreca.pdf
1.1 MiB
119
Annex B Statistical Analysis
November 23, 2016
Annex B Statistical Analysis
Annex-B_Statistical-Analysis.pdf
0.2 MiB
119
2013 Asset Management - Technical Supplementary Report On The Case Studies (2)
December 2, 2016
2013 Asset Management - Technical Supplementary Report On The Case Studies (2)
2013-Asset-management-technical-supplementary-report-on-the-case-studies-2.pdf
1.2 MiB
119
03 ENR SRO3 IRWIN FinalReport V1
November 17, 2016
03 ENR SRO3 IRWIN FinalReport V1
03_ENR_SRO3_IRWIN_FinalReport_V1.pdf
1.7 MiB
118
02 Raider D4 1 Genericspecificationsforincidentdetectionsystems V5
June 8, 2017
02 Raider D4 1 Genericspecificationsforincidentdetectionsystems V5
02_raider-d4_1_genericspecificationsforincidentdetectionsystems_v5.pdf
2.1 MiB
118
MOBI-ROMA
November 18, 2016
MOBI-ROMA
05_mobi-roma-kln-2012-12-11.pdf
2.3 MiB
117
05 Miravec D4.1 V2.0 Pdf Cfr6tnx
January 12, 2018
05 Miravec D4.1 V2.0 Pdf Cfr6tnx
05_miravec_d4.1_v2.0.pdf.cfr6tnx.partial
0.4 MiB
116
POTHOLE
November 18, 2016
POTHOLE
01_pothole_d1-european-definition-of-the-term-pothole.pdf
0.2 MiB
115
04 ERASER WP05 Deliverable Final
November 18, 2016
04 ERASER WP05 Deliverable Final
04_ERASER-WP05-Deliverable_Final.pdf
2.5 MiB
114
04 D4 Simulator Study SPACE 120214
November 25, 2016
04 D4 Simulator Study SPACE 120214
04_D4-simulator-study-SPACE_120214.pdf
1.5 MiB
114
Deliverable G Part B Maintenance Handbook
June 29, 2017
Deliverable G Part B Maintenance Handbook
Deliverable-G_Part-B_Maintenance-Handbook.pdf
2.0 MiB
114
CEDR BRoWSER Benefits Case July 2013
November 24, 2016
CEDR BRoWSER Benefits Case July 2013
CEDR-BRoWSER-Benefits-Case-July-2013.pdf
1.2 MiB
113
SWAMP
November 17, 2016
SWAMP
03_Report-2-Background-Report.pdf
2.2 MiB
112
ASAP D4 1 Appendix1 PRAHA - BRNO 1
November 23, 2016
ASAP D4 1 Appendix1 PRAHA - BRNO 1
ASAP_D4-1_Appendix1_PRAHA-BRNO-1.pdf
2.3 MiB
112
00 Enr2011 Energy Project Description Cereal
December 14, 2016
00 Enr2011 Energy Project Description Cereal
00_enr2011-energy-project-description-cereal.pdf
30 KiB
112
PRACT-WP1-Overview of existing Accident Prediction Models and Data Sources
June 26, 2017
3.1 MiB
112
ERASER
November 18, 2016
ERASER
02_ERASER-WP02-Deliverable_Final_120326.pdf
2.4 MiB
111
CEDR BRoWSER Background Concept Note
November 24, 2016
CEDR BRoWSER Background Concept Note
CEDR-BRoWSER-background-concept-note_2.pdf
86 KiB
111
1.0 MiB
110
ASAP D4 1 Appendix1 BRNO - PRAHA 1
November 23, 2016
ASAP D4 1 Appendix1 BRNO - PRAHA 1
ASAP_D4-1_Appendix1_BRNO-PRAHA-1.pdf
3.3 MiB
109
02 Liccer D1 Ws Appendix1and2
December 14, 2016
02 Liccer D1 Ws Appendix1and2
02_liccer-d1-ws-appendix1and2.pdf
0.1 MiB
108
CR 2018-2 Call 2013 Roads And Wildlife End Of Programme Report
June 1, 2018
CR 2018-2 Call 2013 Roads And Wildlife End Of Programme Report
CR-2018-2_Call-2013-Roads-and-Wildlife-End-of-Programme-Report.pdf

Four projects were commissioned through the CEDR call 2013 Roads and Wildlife Research Programme: SAFEROAD, Harmony, SafeBatPaths and ECOROAD. This End-of-Programme report summarises the objectives, research approach, key findings and added value of these research projects. It also presents the executed and planned activities to disseminate the findings as well as potential synergies between the projects. Furthermore, it provides guidance on how the findings can be implemented and presents recommendations for future research.

0.6 MiB
108
00 Enr2011-design-project-description-toolbox
November 18, 2016
00 Enr2011-design-project-description-toolbox
00_enr2011-design-project-description-toolbox.pdf
0.1 MiB
107
D4.2 Risk Optimisation in Road Infrastructure Elements
June 26, 2017
D4.2 Risk Optimisation in Road Infrastructure Elements
D4.2-Risk-Optimisation-in-Road-Infrastructure-Elements.pdf
1.9 MiB
107
Risk modelling methodology (M.1)
June 26, 2017
Risk modelling methodology (M.1)
CEDR-Call-2013_X-ARA_D2.1_Risk-modelling-methodology_final.pdf
1.6 MiB
107
1_CEDR-PRESENTATION.pdf
October 9, 2017
1_CEDR-PRESENTATION.pdf
1_CEDR-PRESENTATION.pdf
6.3 MiB
106
D2.2 Modelling of Acoustic Aging of Road Surfaces
November 24, 2016
D2.2 Modelling of Acoustic Aging of Road Surfaces
CEDR-QUESTIM-WP2-D2.2-report-on-acoustic-aging-final.pdf
5.6 MiB
105
CEDR2014 Mobility Final Conferenceagenda V01
April 13, 2017
CEDR2014 Mobility Final Conferenceagenda V01
CEDR2014-Mobility-final-conferenceagenda_v01.docx
25 KiB
105
Business Process Maps
June 23, 2017
Business Process Maps
INTERLINK-D.2-D.3-Business-Process-Maps-Final-Issue.pdf
0.5 MiB
105
Assessment of technologies with potential for energy reduction (D2.1)
June 29, 2017
Assessment of technologies with potential for energy reduction (D2.1)
D2.1-Description_and_assessment_results_v1.0.pdf
1.6 MiB
105
05 Report 4 Inspection And Maintenance
November 17, 2016
05 Report 4 Inspection And Maintenance
05_Report-4-Inspection-and-maintenance.pdf
0.1 MiB
104
Deliverable G Part A Cost-Effective Maintenance To Support The Ecological Functions Of Roads
June 29, 2017
Deliverable G Part A Cost-Effective Maintenance To Support The Ecological Functions Of Roads
Deliverable-G_Part-A_Cost-Effective-Maintenance-to-Support-the-Ecological-Functions-of-Roads.pdf
1.3 MiB
104
01 Liccer D1 Report From First Workshop
December 14, 2016
01 Liccer D1 Report From First Workshop
01_liccer-d1_report-from-first-workshop.pdf
0.4 MiB
103
Library list of relevant literature for WPA
June 23, 2017
Library list of relevant literature for WPA
INTERLINK-D.1-Literature-Library-List.pdf
0.7 MiB
103
Poster
June 23, 2017
Poster
INTERLINK-D.2-D.3-Poster-Final-Issue.pdf
0.8 MiB
103
Deliverable B_Final Report
June 29, 2017
Deliverable B_Final Report
Deliverable-B_Procedures-for-the-Design-of-Roads-in-Harmony-with-Wildlife_Final-Report.pdf
1.0 MiB
103
MOBI-ROMA
November 18, 2016
MOBI-ROMA
02_mobi-roma_d2_report-on-data-collection-fusion-and-analysis.pdf
6.1 MiB
102
2013 Asset Management - Technical Supplementary Report On The Case Studies (1)
December 2, 2016
2013 Asset Management - Technical Supplementary Report On The Case Studies (1)
2013-Asset-management-technical-supplementary-report-on-the-case-studies-1.pdf
1.2 MiB
102
EUSight_D4_Parameter_study
June 26, 2017
EUSight_D4_Parameter_study
Eusight_D4_Parameter_study.pdf
3.1 MiB
102
10 SEGURIDAD VIAL EN ESPAÑA
October 9, 2017
10 SEGURIDAD VIAL EN ESPAÑA
10_SEGURIDAD-VIAL-EN-ESPAÑA.pdf
4.7 MiB
101
Project Description
November 17, 2016
Project Description
00_ENR-SRO3_project-SWAMP_updated.pdf
0.2 MiB
100
CONSISTEND: Final report
June 29, 2017
CONSISTEND: Final report
D56_CONSISTEND_final.pdf
1.1 MiB
100
ASAP D4 1 Appendix1 PRAHA - BRNO 3
November 23, 2016
ASAP D4 1 Appendix1 PRAHA - BRNO 3
ASAP_D4-1_Appendix1_PRAHA-BRNO-3.pdf
2.4 MiB
99
CEDR  - NATIONAL ROAD ADMINISTRATION - Norway
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION - Norway
Norway - bridge section.pdf
0.6 MiB
98
07 ENR SRO4 SBAKPI  Description
December 2, 2016
07 ENR SRO4 SBAKPI Description
07_ENR-SRO4_SBAKPI_-Description.pdf
33 KiB
98
Eusight D6 Representative Parameter Value
June 26, 2017
Eusight D6 Representative Parameter Value
Eusight_D6_Representative_parameter_value.pdf
2.4 MiB
98
02 ERA-NET Monitoring Progress Report 1 RIMAROCC Website
November 17, 2016
02 ERA-NET Monitoring Progress Report 1 RIMAROCC Website
02_ERA-NET-Monitoring-Progress-Report-1-RIMAROCC_website.pdf
56 KiB
97
ASAP D4 1 Appendix1 PRAHA - BRNO 4
November 23, 2016
ASAP D4 1 Appendix1 PRAHA - BRNO 4
ASAP_D4-1_Appendix1_PRAHA-BRNO-4.pdf
2.4 MiB
97
TRA 3RD ANNOUNCEMENT 3RD PROOF
March 8, 2017
TRA 3RD ANNOUNCEMENT 3RD PROOF
TRA-3RD-ANNOUNCEMENT-3RD-PROOF.pdf
2.8 MiB
97
Road Safety:
October 9, 2017
Road Safety:
5_PIARC-and-ROAD-SAFETY.pdf
1.2 MiB
97
6_Efectividad-Medidas-SV.pdf
October 9, 2017
6_Efectividad-Medidas-SV.pdf
6_Efectividad-Medidas-SV.pdf
5.5 MiB
97
PROCROSS
November 18, 2016
PROCROSS
05_ENR-SRO4_PROCROSS_-Description.pdf
34 KiB
96
D4.1 Report of the literature review on risk
June 26, 2017
D4.1 Report of the literature review on risk
D4.1-Report-of-the-literature-review-on-risk.pdf
2.2 MiB
96
TRA 2008 4thAnnouncement
March 8, 2017
TRA 2008 4thAnnouncement
TRA-2008_4thAnnouncement.pdf
10.5 MiB
95
Project Description
November 15, 2016
Project Description
00_ENR-SRO3_project-IRWIN.pdf
32 KiB
95
EUSight_D5_Driving_experiment
June 26, 2017
EUSight_D5_Driving_experiment
Eusight_D5_Driving_experiment.pdf
10.3 MiB
95
02 ENR SRO3 IRWIN D2 Second Inception Report V1
November 15, 2016
02 ENR SRO3 IRWIN D2 Second Inception Report V1
02_ENR_SRO3_IRWIN_D2_Second-Inception-Report-V1.pdf
1.0 MiB
94
86 KiB
94
01 SWAMP Inception Report 0209
November 17, 2016
01 SWAMP Inception Report 0209
01_SWAMP-Inception-report_0209.pdf
0.2 MiB
94
EARN Project Description
November 24, 2016
EARN Project Description
cedr-call-2012_recycling-_earn.pdf
36 KiB
93
ANACONDA_D4.1_Report on data collection and processing
November 27, 2017
6.3 MiB
93
Project Description
November 15, 2016
Project Description
00_ENR-SRO3_project-P2R2C2.pdf
30 KiB
92
D2.1 State of the Art on Speed Management Methods
November 23, 2016
D2.1 State of the Art on Speed Management Methods
ASAP_D2.1_State-of-the-Art-on-Speed-Management-Methods_final.pdf
2.8 MiB
92
Seamless traffic data dissemination across
June 8, 2017
Seamless traffic data dissemination across
05_2012-11-21_seamless_peb-meeting_delft_00-02-00.pdf
3.9 MiB
92
D2.5 Final Dissemination Conference
July 18, 2017
D2.5 Final Dissemination Conference
D2.5-Final-Dissemination-Conference.pdf
7.7 MiB
92
ASAP D4 1 Appendix1 BRNO - PRAHA 4
November 23, 2016
ASAP D4 1 Appendix1 BRNO - PRAHA 4
ASAP_D4-1_Appendix1_BRNO-PRAHA-4.pdf
3.3 MiB
91
ON AIR_Examples
November 24, 2016
ON AIR_Examples
ON_AIR_Examples_2015-12-22.pdf
5.5 MiB
91
09 ENR SRO1 Project RISMET Joint Meeting Presentations 040310
November 25, 2016
09 ENR SRO1 Project RISMET Joint Meeting Presentations 040310
09_ENR-SRO1_project-RISMET_Joint-Meeting-Presentations_040310.pdf
63 KiB
91
TEXT ERASER
November 18, 2016
TEXT ERASER
TEXT_ERASER.docx
15 KiB
90
POTHOLE
November 18, 2016
POTHOLE
02_pothole_d2-testing-methods.pdf
51 KiB
90
01 Seamless D1 Project Initation
June 8, 2017
01 Seamless D1 Project Initation
01_seamless_d1-project-initation.pdf
1.6 MiB
90
Energy efficient materials and technologies and their impact on sustainability  (D1.1)
June 28, 2017
Energy efficient materials and technologies and their impact on sustainability (D1.1)
Energy-efficient-materials-and-technolgies-and-their-impact-on-sustainabilty-D-1-1.pdf
1.8 MiB
90
WP4-Report 4a: Report on the demonstration projects
June 29, 2017
3.2 MiB
90
CEDR  - NATIONAL ROAD ADMINISTRATION
March 17, 2016
CEDR - NATIONAL ROAD ADMINISTRATION
Denmark-High-capacity-use-on-motorways-and-junctions.pdf
0.4 MiB
89
02 Final ENR Deliverable D2 On Simple Method V4
November 25, 2016
02 Final ENR Deliverable D2 On Simple Method V4
02_final-ENR_Deliverable_D2_on_simple_method-V4.pdf
0.6 MiB
89
P – Short TErm Prediction
June 8, 2017
P – Short TErm Prediction
08_step-finalconference-20130927.pdf
0.7 MiB
89
HI-SPEQ Project Description
February 9, 2018
0.3 MiB
89
D2.2 Report of Critical Infrastructure Elements
June 26, 2017
D2.2 Report of Critical Infrastructure Elements
D2.2-Report-of-Critical-Infrastructure-Elements.pdf
3.8 MiB
89
Deliverable E_Part A_Report on Procurement, Follow-up and Performance Indicators
June 29, 2017
Deliverable E_Part A_Report on Procurement, Follow-up and Performance Indicators
Deliverable-E-Part-A_Report-on-Procurement-Follow-up-and-Performance-Indicators.pdf
0.8 MiB
89
TEXT RIMAROCC
November 17, 2016
TEXT RIMAROCC
TEXT_RIMAROCC.docx
16 KiB
88
SABARIS
November 18, 2016
SABARIS
06_ENR-SRO4_SABARIS_-Description.pdf
32 KiB
88
TEXT MOBI-ROMA
November 18, 2016
TEXT MOBI-ROMA
TEXT_MOBI-ROMA.docx
16 KiB
88
RECYPMA - D 4 1 - Final Version
November 18, 2016
RECYPMA - D 4 1 - Final Version
RECYPMA-D-4-1-final-version.pdf
1.4 MiB
88
Investigation of noise planning procedures and tools
November 24, 2016
Investigation of noise planning procedures and tools
Deliverable-1_Report_ON-AIR_WP2_h.pdf
4.1 MiB
88
CEDR BRoWSER Poster For TRA2014
November 24, 2016
CEDR BRoWSER Poster For TRA2014
CEDR-BRoWSER-Poster-for-TRA2014.pdf
1.3 MiB
88
01 Raider D2.1 Working Document Of User Needs And User Requirements For = Incident Detection Systems
June 8, 2017
01 Raider D2.1 Working Document Of User Needs And User Requirements For = Incident Detection Systems
01_raider_d2.1_working_document_of_user_needs_and_user_requirements_for-_incident_detection_systems.pdf
1.3 MiB
88
D1.1 Quality Assurance Plan
June 26, 2017
D1.1 Quality Assurance Plan
D1.1-Quality-Assurance-Plan.pdf
0.6 MiB
88
X-ARA Final Report (D0.3)
June 26, 2017
X-ARA Final Report (D0.3)
CEDR-Call-2013_X-ARA_D0.3_Final-report_final.pdf
1.1 MiB
88
TEXT SWAMP
November 17, 2016
TEXT SWAMP
TEXT_SWAMP.docx
15 KiB
87
ISABELA_D2.1_Definition of S-KPIs to be used in road asset management
November 21, 2017
ISABELA_D2.1_Definition of S-KPIs to be used in road asset management
ISABELA-D2.1-Indicators-report_v1.3-25112016.pdf
2.4 MiB
87
4.2 MiB
87
BEST4ROAD_Framework for analysing maintenance procurement practices
November 24, 2017
BEST4ROAD_Framework for analysing maintenance procurement practices
cedr_asset_BEST4ROAD_deliverable_1.1_final_v20170630.pdf
0.1 MiB
87
00 Enr2011 Design Project Description Mobi-roma
November 18, 2016
00 Enr2011 Design Project Description Mobi-roma
00_enr2011-design-project-description-mobi-roma.pdf
22 KiB
86
ASAP D4 1 Appendix1 PRAHA - BRNO 2
November 23, 2016
ASAP D4 1 Appendix1 PRAHA - BRNO 2
ASAP_D4-1_Appendix1_PRAHA-BRNO-2.pdf
2.4 MiB
86
DISTANCE Project Description
November 24, 2016
DISTANCE Project Description
CEDR-Call-2012-DISTANCE.pdf
0.2 MiB
86
Decision-support for investing in
June 8, 2017
Decision-support for investing in
07_cobra-finalconference-20130927.pdf
1.1 MiB
86
Eusight D2 Literature Review
June 26, 2017
Eusight D2 Literature Review
Eusight_D2_Literature_review.pdf
3.7 MiB
86
D4.1 ON AIR Guidance Book on the Integration of Noise in Road Planning
November 24, 2016
5.6 MiB
85
Y COBRA Project Description
June 8, 2017
Y COBRA Project Description
00_enr2011-mobility-project-description-cobra.pdf
0.1 MiB
85
00 ENR SRO1 Project RISMET
November 25, 2016
00 ENR SRO1 Project RISMET
00_ENR-SRO1_project-RISMET.pdf
33 KiB
84
03 Raider D5 1 Summaryreport
June 8, 2017
03 Raider D5 1 Summaryreport
03_raider_d5_1_summaryreport_1.0.pdf
0.6 MiB
84
5_PIARC-and-ROAD-SAFETY
October 9, 2017
5_PIARC-and-ROAD-SAFETY
5_PIARC-and-ROAD-SAFETY.pdf
1.2 MiB
84
Project Nr: TR80A 2008:72148
November 17, 2016
Project Nr: TR80A 2008:72148
03_ENR-WP2-RIMAROCC-MPR-2_website.pdf
0.1 MiB
83
06 ENR SRO3 Project IRWIN Downscaling For IRWIN Helsinki Meeting DaveRayner 2009
November 17, 2016
06 ENR SRO3 Project IRWIN Downscaling For IRWIN Helsinki Meeting DaveRayner 2009
06_ENR-SRO3_project_IRWIN_Downscaling_for_IRWIN_Helsinki_Meeting_DaveRayner-2009.pdf
1.5 MiB
83
Speed management at Work Zone - Field studies and stakeholder’s survey
November 23, 2016
Speed management at Work Zone - Field studies and stakeholder’s survey
ASAP_D4-1_PracticalInfofromFieldStudiesStakeholderSurv_FinalDraft_v2312am.compressed.pdf
5.6 MiB
83
05 Cereal Dhv 121120 Delf
December 14, 2016
05 Cereal Dhv 121120 Delf
05_cereal_dhv_121120_delf.pdf
0.6 MiB
83
Deliverable E Part B Handbook On Procurement And Follow Up (incl  Performance Indicators)
June 29, 2017
Deliverable E Part B Handbook On Procurement And Follow Up (incl Performance Indicators)
Deliverable-E-Part-B_Handbook-on-Procurement-and-Follow-Up-incl.-performance-indicators.pdf
0.4 MiB
83
11_EIB-FINANCING-ROAD-SAFETY
October 9, 2017
11_EIB-FINANCING-ROAD-SAFETY
11_EIB-FINANCING-ROAD-SAFETY.pdf
1.2 MiB
83
DRaT_D3_Compendium of sites and the extent of ravelling
November 24, 2017
DRaT_D3_Compendium of sites and the extent of ravelling
DRaT_D3_Compendium_of_sites_and_the_extent_of_ravelling.pdf
3.1 MiB
83
DISTANCE
November 24, 2016
DISTANCE
DISTANCE.docx
47 KiB
82
02 Cereal D2 Functional Requirenments
December 14, 2016
02 Cereal D2 Functional Requirenments
02_cereal_d2_functional-requirenments.pdf
0.2 MiB
82
A Cooperative Benefits for Road
June 8, 2017
A Cooperative Benefits for Road
03_cobra_d3-results-of-the-impact-assessment.pdf
2.0 MiB
82
X-ARA Desk Study (D1.1)
June 26, 2017
X-ARA Desk Study (D1.1)
CEDR-Call-2013_X-ARA_D1.1_Desk-Study_final.pdf
0.5 MiB
82
Risk framework and modelling specifications (D1.2 & D2.1)
June 26, 2017
Risk framework and modelling specifications (D1.2 & D2.1)
CEDR-Call-2013_X-ARA_D1.2_D2.1_Risk-framework-and-modelling-specifications_final.pdf
4.0 MiB
82
ISABELA D1.1 Investigation Report
November 21, 2017
ISABELA D1.1 Investigation Report
ISABELA-D1.1-Investigation-report_final.pdf
2.1 MiB
82
BEST4ROAD_Country-specific reports on road maintenance procurement
November 24, 2017
BEST4ROAD_Country-specific reports on road maintenance procurement
cedr_asset_BEST4ROAD_deliverable_1.2_final_v20170630.pdf
0.4 MiB
82
00 ENR SRO1 Project EuRSI
November 18, 2016
00 ENR SRO1 Project EuRSI
00_ENR-SRO1_project-EuRSI.pdf
33 KiB
81
ERA NET Roads EuRSI Transnational Test 2010/2011                                            Trans-National Test – Ireland (EuRSI Partner = PMS)
November 18, 2016
1.1 MiB
81
06 ENR SRO1 ERASER
November 18, 2016
06 ENR SRO1 ERASER
06_ENR-SRO1_ERASER.pdf
3.2 MiB
80
TEXT POTHOLE
November 18, 2016
TEXT POTHOLE
TEXT_POTHOLE.docx
16 KiB
80
A Cooperative Benefits for Road
June 8, 2017
A Cooperative Benefits for Road
04b_cobra-d4-2-tool-user-guide-v0-6.pdf
3.3 MiB
80
WP 1: Review of current situation and forecasts (D1.1)
November 27, 2017
5.0 MiB
80
04 ENR SRO3 Project IRWIN Presentation Klimator Helsinki
November 17, 2016
04 ENR SRO3 Project IRWIN Presentation Klimator Helsinki
04_ENR-SRO3_project_IRWIN_Presentation_Klimator_Helsinki.pdf
1.8 MiB
79
00 ENR SRO1 Project IRDES
November 18, 2016
00 ENR SRO1 Project IRDES
00_ENR-SRO1_project-IRDES.pdf
30 KiB
79
02 Quatra D4-1 Interim-report
June 8, 2017
02 Quatra D4-1 Interim-report
02_quatra_d4-1_interim-report.pdf
1.5 MiB
79
4 CEDR WORK GROUP ROAD SAFETY
October 9, 2017
4 CEDR WORK GROUP ROAD SAFETY
4_CEDR-WORK-GROUP-ROAD-SAFETY.pdf
1.4 MiB
79
DRaT_D2_Review of parameters influencing the propensity of asphalt to ravel
November 24, 2017
0.8 MiB
78
Cooperation Between Western European Road Directors (2000)
September 1, 2000
Cooperation Between Western European Road Directors (2000)
Cooperation-between-Western-European-Road-Directors-2000.pdf
15.7 MiB
77
D3.1 Assessment of traffic noise in complex situations
November 24, 2016
5.6 MiB
76
2017-04 TEN-T Tender V2
April 10, 2017
2017-04 TEN-T Tender V2
2017-04-TEN-T-tender-v2.docx
44 KiB
76
1.2 MiB
76
TEXT Intermat4PMS
November 18, 2016
TEXT Intermat4PMS
TEXT_Intermat4PMS.docx
16 KiB
75
R Transnational Research Programme: Call 2012
November 23, 2016
R Transnational Research Programme: Call 2012
CEDR-BRoWSER-background-concept-note.pdf
86 KiB
75
TEXT SPACE
November 25, 2016
TEXT SPACE
TEXT_SPACE.docx
16 KiB
75
03 Quatra Deliverable Final-report
June 8, 2017
03 Quatra Deliverable Final-report
03_quatra_deliverable_final-report.pdf
1.4 MiB
75
Vienna
June 8, 2017
Vienna
05_quatra_finalconference_20130927.pdf
1.9 MiB
75
7_Presentacion-PLATAFORMA-TECNOLOGICA-DE-LA-CARRETERA
October 9, 2017
7_Presentacion-PLATAFORMA-TECNOLOGICA-DE-LA-CARRETERA
7_Presentacion-PLATAFORMA-TECNOLOGICA-DE-LA-CARRETERA.pdf
1.8 MiB
74
IRDES
November 18, 2016
IRDES
07_IRDES_D52_Proceedings_second_webinar_V2.0_31.1.2012.pdf
0.3 MiB
73
TEXT IRDES
November 18, 2016
TEXT IRDES
TEXT_IRDES.docx
16 KiB
73
01 Cereal D1 Preliminary Results Of The Survey
December 14, 2016
01 Cereal D1 Preliminary Results Of The Survey
01_cereal_d1_preliminary-results-of-the-survey.pdf
0.1 MiB
73
MAASiFiE_Business and operator models for MaaS (D3)
November 27, 2017
MAASiFiE_Business and operator models for MaaS (D3)
cedr_mobility_MAASiFiE_deliverable_3_revised_final_2.pdf
3.7 MiB
73
TEXT EuRSI
November 18, 2016
TEXT EuRSI
TEXT_EuRSI.docx
16 KiB
72
Final Report, 30.11.2011
November 18, 2016
Final Report, 30.11.2011
01_IRDES_D0.2_Final-Report_V2.0_30012012.pdf
0.3 MiB
72
ENR2011 DESIGN RECYPMA Project Description
November 18, 2016
ENR2011 DESIGN RECYPMA Project Description
00_enr2011-design-project-description-recypma.pdf
0.2 MiB
72
EUSight_D3_Scenarios
June 26, 2017
EUSight_D3_Scenarios
Eusight_D3_Scenarios.pdf
1.5 MiB
72
Secondments To The CEDR Secretariat
December 13, 2015
Secondments To The CEDR Secretariat
Secondments to the CEDR Secretariat.docx
0.1 MiB
71
ON-AIR Project Description
November 24, 2016
ON-AIR Project Description
CEDR-Call-2012-ON-AIR.pdf
0.1 MiB
71
CEDR BRoWSER D11 1 EuRoWCas - Guidance And Information For NRAs - April 2015
November 24, 2016
CEDR BRoWSER D11 1 EuRoWCas - Guidance And Information For NRAs - April 2015
CEDR-BRoWSER-D11_1-EuRoWCas-Guidance-and-information-for-NRAs-April-2015.pdf
0.6 MiB
71
01 Quatra D2-1 State-of-the-art App
June 8, 2017
01 Quatra D2-1 State-of-the-art App
01_quatra_d2-1_state-of-the-art_app.pdf
0.3 MiB
71
Realising Advanced Incident Detection on European Roads
June 8, 2017
Realising Advanced Incident Detection on European Roads
05_raider_finalconference-20130927.pdf
0.4 MiB
71
P (Short TErm Prediction)
June 8, 2017
P (Short TErm Prediction)
02_step_d3_a-from-wp3-development-of-user-interface.pdf
91 KiB
71
TRA 2006 Wrap Up Report
March 8, 2017
TRA 2006 Wrap Up Report
TRA_2006_Wrap_Up_Report.doc
0.4 MiB
70
P Project – Work
June 8, 2017
P Project – Work
06_step-project_-wp1-final-report-app.pdf
1.4 MiB
70
Dissemination - Education program for users of X-ARA (D4.1)
June 26, 2017
Dissemination - Education program for users of X-ARA (D4.1)
CEDR-Call-2013_X-ARA_D4.1-Dissemination-Education-Program_final.pdf
1.0 MiB
70
9_PRESENTACION-MEXICO-SEGURIDAD-VIAL
October 9, 2017
9_PRESENTACION-MEXICO-SEGURIDAD-VIAL
9_PRESENTACION-MEXICO-SEGURIDAD-VIAL.pdf
0.9 MiB
70
TEXT IRWIN
November 17, 2016
TEXT IRWIN
TEXT_IRWIN.docx
15 KiB
69
Guidance document on the sustainability assessment of bituminous materials and technologies (D2.2)
June 28, 2017
Guidance document on the sustainability assessment of bituminous materials and technologies (D2.2)
D2-2-Guidance-document-on-the-sustainability-assessment-of-bituminous-materials-and-technologies-v1-0x.pdf
0.9 MiB
69
HARMONY Project Description
June 29, 2017
0.3 MiB
69
01 Recypma D2-1 And D2-2- Stateof The Art - Recycling Poymer Modified Asphalt
November 18, 2016
01 Recypma D2-1 And D2-2- Stateof The Art - Recycling Poymer Modified Asphalt
01_recypma_d2-1-and-d2-2-stateof-the-art-recycling-poymer-modified-asphalt.pdf
1.1 MiB
68
TEXT RISMET
November 25, 2016
TEXT RISMET
TEXT_RISMET.docx
16 KiB
68
02 Seamless D2 Business Case For Seamless
June 8, 2017
02 Seamless D2 Business Case For Seamless
02_seamless_d2_business_case_for_seamless.pdf
0.9 MiB
68
P Project Evaluation Report, June 2013
June 8, 2017
P Project Evaluation Report, June 2013
05_step-deliverable-wp5_project-evaluation-report.pdf
0.4 MiB
68
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Italy - Anas Civil or Geotechnical Engineer.pdf
0.6 MiB
67
Y ACRONYM Project Description
June 8, 2017
Y ACRONYM Project Description
STEP-mobility-project-description.pdf
33 KiB
67
03 ENR SRO4 EXPECT  Description
November 18, 2016
03 ENR SRO4 EXPECT Description
03_ENR-SRO4_EXPECT_-Description.pdf
32 KiB
66
QUESTIM Project Description
November 24, 2016
QUESTIM Project Description
cedr-call-2012_noise_questim.pdf
44 KiB
65
ToR TRA 2010 Brussels 3
March 8, 2017
ToR TRA 2010 Brussels 3
ToR_TRA_2010_Brussels_3.doc
0.2 MiB
65
D1.6 Upgraded Toolkit
July 18, 2017
D1.6 Upgraded Toolkit
D1.6-Upgraded-Toolkit.pdf
0.5 MiB
65
4.3 MiB
65
05 D5 SPACE  Comparision Ofmethods Technical  120229
November 25, 2016
05 D5 SPACE Comparision Ofmethods Technical 120229
05_D5_SPACE-_comparision-ofmethods_technical-_120229.pdf
0.3 MiB
64
1985 ANAS Proposal For Road Directors Association
May 17, 2017
1985 ANAS Proposal For Road Directors Association
1985-ANAS-proposal-for-Road-Directors-association.pdf

Original proposal from ANAS Italy for the creation of a European road directors association (based in Rome).

0.8 MiB
64
Realising Advanced Incident Detection on European Roads
June 8, 2017
0.4 MiB
64
04 Seamless 4th-deliverable 01-00-00
June 8, 2017
04 Seamless 4th-deliverable 01-00-00
04_seamless_4th-deliverable_01-00-00.pdf
0.1 MiB
64
Netherlands Pilot of Short Term Predictions, May 2013
June 8, 2017
Netherlands Pilot of Short Term Predictions, May 2013
04_step-deliverable-wp4b_step-pilot-report.pdf
1.1 MiB
64
PRACT Project Outline
June 26, 2017
PRACT Project Outline
PRACT_Outline-1.pdf
0.8 MiB
64
D1.2 Report On Joint Call 2010
July 18, 2017
D1.2 Report On Joint Call 2010
D1.2-Report-on-Joint-Call-2010.pdf
1.0 MiB
64
DRAGON_WP 4: Findings Report (D4.1)
November 27, 2017
0.4 MiB
64
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Task group I7 Junior Secretary.pdf
0.4 MiB
63
07 Step Presentation Eranetmeeting Nov 2012 Amended Presentation 191112
June 8, 2017
07 Step Presentation Eranetmeeting Nov 2012 Amended Presentation 191112
07_step-presentation_eranetmeeting_nov-2012_amended-presentation-191112.pdf
0.7 MiB
63
PREMiUM_Summary of Deliverables 1 and 2 of the PREMiUM project and the Work Required to Achieve the Recommendations
November 21, 2017
0.5 MiB
63
PREMiUM_D1a-D2a_Identifying the key characteristics for vehicle restraint system condition measurements
November 21, 2017
2.0 MiB
63
CEDR Call 2015 Summaries INTERLINK
December 15, 2016
CEDR Call 2015 Summaries INTERLINK
CEDR-Call-2015_Summaries-INTERLINK.pdf
0.1 MiB
62
European MaaS Roadmap 2025
June 23, 2017
European MaaS Roadmap 2025
cedr_mobility_MAASiFiE_deliverable_2_revised_final.pdf
1.1 MiB
62
0.3 MiB
62
D1.3 Joint Call
July 18, 2017
D1.3 Joint Call
D1.3-Joint-Call.pdf
0.8 MiB
61
PREMiUM_D1d-D2d_Identifying the key characteristics for environmental noise barrier condition measurements
November 21, 2017
3.2 MiB
60
Das Bild kann zurzeit nicht angezeigt werden.
January 12, 2018
Das Bild kann zurzeit nicht angezeigt werden.
06_enr_miravec_deliverable_5.3_v3.0.pdf
0.2 MiB
60
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Italy - Road Designer.pdf
0.6 MiB
59
EXPECT D2.4.1 Report On Consultation Meetings
December 2, 2016
EXPECT D2.4.1 Report On Consultation Meetings
EXPECT-D2.4.1-Report-on-consultation-meetings.pdf
0.2 MiB
59
Y QUATRA Project Description
June 8, 2017
Y QUATRA Project Description
QUATRA_project-description.pdf
61 KiB
59
Deliverable D_Recommendations on Appraisal Process & Report on Consultations
June 29, 2017
Deliverable D_Recommendations on Appraisal Process & Report on Consultations
Deliverable-D_Recommendations-on-Appraisal-Procss-and-Report-on-Consultations.pdf
2.7 MiB
59
ISABELA_Project Description
November 21, 2017
ISABELA_Project Description
cedr_asset_project_description_ISABELA_20150928.pdf
0.1 MiB
59
08 Miravec Project
January 12, 2018
08 Miravec Project
08_miravec_project.pdf
1.6 MiB
59
European Sight Distances in perspective
June 26, 2017
0.2 MiB
58
D3 1 Demonstration Of The Methodology To Assess Sustainability 261016
June 28, 2017
D3 1 Demonstration Of The Methodology To Assess Sustainability 261016
D3-1-Demonstration-of-the-methodology-to-assess-sustainability_261016.pdf
3.0 MiB
58
Det går inte att visa bilden för tillfället.
January 11, 2018
Det går inte att visa bilden för tillfället.
HEROAD-D1.1-Report-on-pavement-performance.pdf
0.7 MiB
58
3.9 MiB
58
DRAGON Project Summary
November 27, 2017
DRAGON Project Summary
DRAGON_Project_summary.pdf
0.1 MiB
58
ON-AIR
November 24, 2016
ON-AIR
ON-AIR.docx
28 KiB
57
Y RAIDER Project Description
June 8, 2017
Y RAIDER Project Description
RAIDER_project_description.pdf
0.1 MiB
56
SiFiE
August 23, 2017
SiFiE
CEDR_Mobility_MAASIFIE_Deliverable_4_Revised_Final.pdf
3.0 MiB
56
D1.4 Report On Joint Call
July 18, 2017
D1.4 Report On Joint Call
D1.4-Report-on-Joint-Call.pdf
0.5 MiB
56
LINKING
November 10, 2017
LINKING
Appendix4-INTERLINK-D4-LinkingBackgroundInformation.pdf
1.0 MiB
56
DRaT_D7_Factual report on test results
November 24, 2017
DRaT_D7_Factual report on test results
DRaT_D7_Factual_report_on_test_results-v1.pdf
2.3 MiB
56
ANACONDA_D2.1_Specification of the COBRA+ Monitor
November 27, 2017
1.2 MiB
56
TNO 2017 R10548
November 27, 2017
TNO 2017 R10548
ANACONDA_R10548-Report-on-Implementation-Road-Map.pdf
1.0 MiB
56
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Denmark - Long term transport planning.pdf
0.4 MiB
55
DoRN NOISE CALL2012 Final1 (2)
November 24, 2016
DoRN NOISE CALL2012 Final1 (2)
DoRN_NOISE_CALL2012_Final1-2.pdf
0.2 MiB
55
TEXT QUATRA
June 8, 2017
TEXT QUATRA
TEXT_QUATRA.docx
15 KiB
55
DRaT_Project Flyer
November 24, 2017
DRaT_Project Flyer
DRaT_D1_Flyer.pdf
0.6 MiB
55
SAVeRS V00 Post Workshop
March 21, 2018
SAVeRS V00 Post Workshop
SAVeRS_V00_post-Workshop.xlsm
3.3 MiB
54
TEXT SEAMLESS
June 8, 2017
TEXT SEAMLESS
TEXT_SEAMLESS.docx
15 KiB
54
ANACONDA_D5.1_Report on Use Case Results
November 27, 2017
2.5 MiB
54
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Holland - area development.pdf
0.4 MiB
53
Introduction and Use Case
June 8, 2017
Introduction and Use Case
06_2012-11-peb-meeting-cobra-presentation.pdf
0.3 MiB
53
MAASiFiE_Technology for MaaS (D5)
August 23, 2017
MAASiFiE_Technology for MaaS (D5)
cedr_mobility_MAASiFiE_deliverable_5_revised_final.pdf
1.0 MiB
53
2_DIRCAIBEA-PRESENTATION
October 9, 2017
2_DIRCAIBEA-PRESENTATION
2_DIRCAIBEA-PRESENTATION.pdf
1.4 MiB
53
TEXT RAIDER
June 8, 2017
TEXT RAIDER
TEXT_RAIDER.docx
15 KiB
52
D1.5 Analyse Measures For Facilitating And Assessing The Benefits Of Transnational Collaborative Research
July 18, 2017
D1.5 Analyse Measures For Facilitating And Assessing The Benefits Of Transnational Collaborative Research
D1.5-Analyse-measures-for-facilitating-and-assessing-the-benefits-of-transnational-collaborative-research.pdf
0.5 MiB
52
TEXT COBRA
June 8, 2017
TEXT COBRA
TEXT_COBRA.docx
16 KiB
51
TEXT STEP
June 8, 2017
TEXT STEP
TEXT_STEP.docx
15 KiB
51
D1 CONSISTEND Literature Review
June 29, 2017
D1 CONSISTEND Literature Review
D1_CONSISTEND_Literature_review.pdf
1.9 MiB
51
NRA CAD Strategy 2018 Final V2
June 8, 2018
NRA CAD Strategy 2018 Final V2
NRA-CAD-strategy-2018-final-v2.doc

This preliminary discussion paper was released by CEDR to encourage debate with key stakeholders. It explores the likely impact of Connected and Automated Driving (CAD) on road authorities. It explains the major disruptive changes that will significantly alter the fulfilment of roles and responsibilities of National Road Authorities in the near future, highlighting the need of international cooperation.

0.8 MiB
51
HEROAD D2.1 Report On Structures Performance  Recommendations On Optimised Structural Assessment
January 11, 2018
HEROAD D2.1 Report On Structures Performance Recommendations On Optimised Structural Assessment
HEROAD-D2.1-Report-on-structures-performance.-Recommendations-on-optimised-structural-assessment.pdf
1.9 MiB
51
Effective asset management
January 12, 2018
Effective asset management
SABARIS-End-Report.pdf
4.6 MiB
51
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Norway - transport planning section.pdf
0.6 MiB
50
CONSISTEND Project Description
June 29, 2017
0.2 MiB
50
PROCROSS D4  Final Report “The Procedures For Cross Asset Management Optimisation
January 12, 2018
PROCROSS D4 Final Report “The Procedures For Cross Asset Management Optimisation
PROCROSS-D4.-Final-report-“The-Procedures-for-Cross-Asset-Management-Optimisation.pdf
1.5 MiB
50
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Denmark - High capacity use on motorways and junctions.pdf
0.4 MiB
49
03 ENR SRO3 IRWIN FinalReport V1
November 15, 2016
03 ENR SRO3 IRWIN FinalReport V1
03_ENR_SRO3_IRWIN_FinalReport_V1.pdf
1.7 MiB
49
Sponsors
June 28, 2017
Sponsors
Edgar-flyer-III.pdf
0.6 MiB
49
D3 CONSISTEND Quality Control Methods
June 29, 2017
D3 CONSISTEND Quality Control Methods
D3_CONSISTEND_Quality_control_methods.pdf
2.3 MiB
49
DRaT_D8_Report on Analysis of Results
November 24, 2017
DRaT_D8_Report on Analysis of Results
DRaT_D8_WP4-VERSION_FINAL_20170712.pdf
2.2 MiB
49
ANACONDA_D3.1_Specification of the COBRA+ tool
November 27, 2017
0.9 MiB
49
Y SEAMLESS Project Description
June 8, 2017
Y SEAMLESS Project Description
SEAMLESS_project-description.pdf
32 KiB
48
Deliverable C_Environmental Legislation and Guidelines
June 29, 2017
Deliverable C_Environmental Legislation and Guidelines
Deliverable-C_Procedures-for-the-Design-of-Roads-in-Harmony-with-Wildlife_Environmental-Legislation-and-Guidelines.pdf
3.0 MiB
48
SAFEROAD Project Description
June 29, 2017
0.2 MiB
48
MAASiFiE_Impact Assessment (D4)
November 27, 2017
MAASiFiE_Impact Assessment (D4)
CEDR_Mobility_MAASIFIE_Deliverable_4_Revised_Final_2.pdf
3.0 MiB
48
1  Candidate Qualities Ver 1.0
August 25, 2016
1 Candidate Qualities Ver 1.0
1.-Candidate-Qualities_Ver-1.0.docx
20 KiB
47
D1b CONSISTEND Literature Review
June 29, 2017
D1b CONSISTEND Literature Review
D1b_CONSISTEND_Literature_review.pdf
3.9 MiB
47
CEDR  - NATIONAL ROAD ADMINISTRATION
December 13, 2015
CEDR - NATIONAL ROAD ADMINISTRATION
Holland - multimodal hub.pdf
0.5 MiB
46
Delft
June 8, 2017
Delft
04_quatra_joint-meeting_01_20121121.pdf
1.7 MiB
46
BEST4ROAD_Quick scan method for risks in maintenance procurement
November 24, 2017
BEST4ROAD_Quick scan method for risks in maintenance procurement
cedr_asset_BEST4ROAD_deliverable-3.2_final_v20170813.pdf
0.1 MiB
46
ANACONDA_D6.1_Report on Implementation Road Map
November 27, 2017
ANACONDA_D6.1_Report on Implementation Road Map
ANACONDA_D6.1-Report-on-Implementation-Road-Map.pdf
1.4 MiB
46
MIRAVEC Dissemination Strategy Report
January 12, 2018
MIRAVEC Dissemination Strategy Report
01_miravec_d5.1_-dissemination-strategy.pdf
0.4 MiB
46
HEROAD D4.1 Report On Environmental Components  Strategies For The Effective Integration Of Environmental
January 11, 2018
HEROAD D4.1 Report On Environmental Components Strategies For The Effective Integration Of Environmental
HEROAD-D4.1-Report-on-environmental-components.-Strategies-for-the-effective-integration-of-environmental-.pdf
0.4 MiB
45
SBAKPI
January 12, 2018
SBAKPI
SBAKPI-D9-End-Rapport.pdf
1.6 MiB
45
D5 CONSISTEND Summary Presentation
June 29, 2017
D5 CONSISTEND Summary Presentation
D5_CONSISTEND_Summary_presentation.pdf
1.5 MiB
44
ANACONDA Project Description
November 27, 2017
ANACONDA Project Description
ANACONDA_cedr_mobility_project_description_v2.doc
74 KiB
44
Final Report
November 28, 2017
Final Report
cedr_mobility_MAASiFiE_final_report.pdf
0.1 MiB
44
European MaaS Roadmap 2025 (D2)
November 27, 2017
European MaaS Roadmap 2025 (D2)
cedr_mobility_MAASiFiE_deliverable_2_revised_final_2.pdf
1.1 MiB
44
CEDR Contractor Report 2017-01_ARISE IMPLEMENTATION GUIDE FOR AN ISO 55001 ASSET MANAGEMENT SYSTEM
December 6, 2017
CEDR Contractor Report 2017-01_ARISE IMPLEMENTATION GUIDE FOR AN ISO 55001 ASSET MANAGEMENT SYSTEM
CEDR-Contractor-Report-2017-1-Implementation-Guide-for-an-ISO-55001-Managementt-System.pdf
2.5 MiB
44
DRaT_D5_Sample Preparation
November 24, 2017
DRaT_D5_Sample Preparation
DRaT_D5_Sample_preparation.pdf
5.1 MiB
43
ANACONDA_D1.1_Results from the stakeholder requirements analysis
November 27, 2017
ANACONDA_D1.1_Results from the stakeholder requirements analysis
ANACONDA_D1.1-Results_from_the_stakeholder_requirement-analysis_v1.pdf
0.6 MiB
43
Interface Specification, July 2012
June 8, 2017
Interface Specification, July 2012
03_step_d3_b-from-wp3-development-of-user-interface.pdf
0.7 MiB
42
EDGAR Project Description
June 28, 2017
0.2 MiB
41
FUNDBITS Project Description
June 29, 2017
0.2 MiB
41
PROCROSS
January 12, 2018
PROCROSS
PROCROSS-D3.-Tentative-Document-The-Procedures-for-Cross-Asset-Management-Optimisation.pdf
1.0 MiB
41
02 Miravec D1.1 Effects
January 12, 2018
02 Miravec D1.1 Effects
02_miravec_d1.1_effects.pdf
1.3 MiB
41
SAVeRS Guideline
March 21, 2018
SAVeRS Guideline
SAVeRS_Guideline.pdf
4.8 MiB
40
HEROAD D3.1  Report On Road Furniture Performance
January 11, 2018
HEROAD D3.1 Report On Road Furniture Performance
HEROAD-D3.1.-Report-on-road-furniture-performance.pdf
0.2 MiB
40
MIRAVEC
January 12, 2018
MIRAVEC
07_miravec_project-presentation_v1.2_2012_11_20.pdf
0.4 MiB
39
SAVeRS WP1 Deliverable 1 1
March 21, 2018
SAVeRS WP1 Deliverable 1 1
SAVeRS_WP1_Deliverable_1_1.pdf
4.7 MiB
38
DRaT_D9_Proposals for revision of standard prCEN/TS 12697-50
November 24, 2017
DRaT_D9_Proposals for revision of standard prCEN/TS 12697-50
DRaT_D9_Proposals_for_revision_of_standard-v1.1.pdf
1.1 MiB
38
OLD TRA2018 Schedule Of CEDR Project Presentations (formal And CEDR Exhibition Area)
April 13, 2018
OLD TRA2018 Schedule Of CEDR Project Presentations (formal And CEDR Exhibition Area)
TRA2018_Schedule-of-CEDR-Project-presentations-formal-and-CEDR-exhibition-area.pdf
0.2 MiB
38
04 Miravec D3.1
January 12, 2018
04 Miravec D3.1
04_miravec_d3.1_v1.0.pdf
1.1 MiB
38
SAVeRS Workshop Proceedings Full
March 21, 2018
SAVeRS Workshop Proceedings Full
SAVeRS_Workshop_Proceedings_full.pdf
21.4 MiB
37
Hi-Speq Final Report
February 9, 2018
Hi-Speq Final Report
hispeq_final_report.pdf
0.7 MiB
37
DRaT_D4_Data Reporting Template
November 24, 2017
DRaT_D4_Data Reporting Template
DRaT_D4_Data_reporting_template.xls
0.1 MiB
37
EDGAR Final Report (D4.6)
June 28, 2017
EDGAR Final Report (D4.6)
D4-6-Final-report_vFinal-revised.pdf
0.6 MiB
36
DRaT_D6_Interim Report
November 24, 2017
DRaT_D6_Interim Report
DRaT_D6_CEDR_Asset_interim-report.pdf
0.1 MiB
35
Det går inte att visa bilden för tillfället.
January 11, 2018
Det går inte att visa bilden för tillfället.
HEROAD-D1.2-How-the-quality-of-pavement-condition-data-is-controlled-in-the-EU.pdf
0.5 MiB
35
PROCROSS
January 12, 2018
PROCROSS
PROCROSS-D1.-Good-practice-in-Cross-Asset-Management-Optimisation.pdf
1.5 MiB
35
DRAGON_WP 3: Cost Benefits assessment (D3.1)
November 27, 2017
0.3 MiB
34
PROCROSS
January 12, 2018
PROCROSS
PRCROSS-D2.-Effective-monitoring-of-road-infrastructure-assets.pdf
1.3 MiB
34
SAVeRS Tool Manual
March 21, 2018
SAVeRS Tool Manual
SAVeRS_Tool_Manual.pdf
1.4 MiB
32
Road Safety Position Paper 2017
March 27, 2017
Road Safety Position Paper 2017
RS_position_paper_2017_v8_170310.pdf

This Position Paper has been prepared to inform National Ministries of the views of CEDR members in the revision of two Directives directly related to road infrastructure safety and share CEDR’s Action Plan activities for improving road safety performance on Europe’s roads. Downloads are password protected.

0.4 MiB
31
Call 2014: Mobility and ITS Project Description
November 28, 2017
Call 2014: Mobility and ITS Project Description
cedr_mobility_project_description_MAASiFiE.pdf
24 KiB
31
ENERGY MIRAVEC Project Description
January 12, 2018
ENERGY MIRAVEC Project Description
00_enr2011-energy-project-description-miravec.pdf
33 KiB
30
01 Sunra D3 Framework-
April 4, 2018
01 Sunra D3 Framework-
01_sunra_d3_framework-_2.0-final.pdf
0.9 MiB
29
Project description
January 12, 2018
Project description
05_ENR-SRO4_PROCROSS_-Description_2.pdf
34 KiB
28
DRaT_Project Description
November 24, 2017
DRaT_Project Description
cedr_asset_project_description_DRaT.pdf
25 KiB
28
06 Sunra Project Framework Organisational Level User Guide
April 4, 2018
06 Sunra Project Framework Organisational Level User Guide
06_sunra-project-framework-organisational-level-user-guide.pdf
0.2 MiB
24
04 Sunra D4 Framework Part2 Accompanying Framework
April 4, 2018
04 Sunra D4 Framework Part2 Accompanying Framework
04_sunra-d4-framework-part2-accompanying-framework.pdf
0.7 MiB
23
08 Sunra Project
April 4, 2018
08 Sunra Project
08_sunra_project.pdf
1.5 MiB
23
AM4INFRA-final Event-AGENDA
April 5, 2018
AM4INFRA-final Event-AGENDA
AM4INFRA-final-event-AGENDA.pdf
0.1 MiB
22
Networking For Urban Vitality Pactical Experiences And Research Agenda
April 15, 2018
Networking For Urban Vitality Pactical Experiences And Research Agenda
Networking-for-Urban-Vitality-pactical-experiences-and-research-agenda.pdf
2.5 MiB
22
07 Sunra Presentation For Peb Meeting 20 Nov 2012 Final Revised
April 4, 2018
07 Sunra Presentation For Peb Meeting 20 Nov 2012 Final Revised
07_sunra-presentation-for-peb-meeting-20-nov-2012-final-revised.pdf
0.8 MiB
21
TEXT SUNRA
April 4, 2018
TEXT SUNRA
TEXT_SUNRA.docx
16 KiB
21
02 Sunra D3 Framework-
April 4, 2018
02 Sunra D3 Framework-
02_sunra_d3_framework-_2.0-short.pdf
0.2 MiB
18
03 Sunra D4 Framework Part2
April 4, 2018
03 Sunra D4 Framework Part2
03_sunra-d4-framework-part2.pdf
1.9 MiB
18
Factsheet Intercor TESTFEST (ENG)
April 15, 2018
Factsheet Intercor TESTFEST (ENG)
Factsheet-Intercor-TESTFEST-ENG.pdf
0.3 MiB
17
C-ITS Corridor Booklet An Overview Of Phase 2
April 15, 2018
C-ITS Corridor Booklet An Overview Of Phase 2
C-ITS-Corridor-Booklet_An-Overview-of-Phase-2.pdf
2.3 MiB
17
Socrates
April 15, 2018
Socrates
Socrates.pdf
2.9 MiB
16
Talking Traffic Brochure
April 15, 2018
Talking Traffic Brochure
Talking-Traffic-Brochure.pdf
6.9 MiB
16
Aernout Van Der Bend NGInfra Wenen TRA CEDR
April 15, 2018
Aernout Van Der Bend NGInfra Wenen TRA CEDR
Aernout-van-der-Bend-NGInfra-Wenen-TRA-CEDR.pdf
0.2 MiB
16
Summary Report NUVit 23 June 2016 EU2016
April 15, 2018
Summary Report NUVit 23 June 2016 EU2016
Summary_Report_NUVit_23_june_2016_EU2016.pdf
1.9 MiB
16
2.0 20180417 CEDR Workshop Open Data ACEA Presentation Joost Vantomme
May 3, 2018
2.0 20180417 CEDR Workshop Open Data ACEA Presentation Joost Vantomme
2.0-20180417-CEDR-workshop-Open-Data-ACEA-presentation-Joost-Vantomme.pdf
1.0 MiB
16
Sheets Towards Corridor Planning
April 15, 2018
Sheets Towards Corridor Planning
Sheets-Towards-Corridor-Planning.pdf
2.5 MiB
15
MapEU 13april
April 15, 2018
MapEU 13april
MapEU_13april.pdf
4.2 MiB
14
Vital-Nodes-Leaflet
April 15, 2018
Vital-Nodes-Leaflet
Vital-Nodes-Leaflet.pdf
1.0 MiB
14
00 Enr2011 Energy Project Description Sunra 120312aphfinal
April 4, 2018
00 Enr2011 Energy Project Description Sunra 120312aphfinal
00_enr2011-energy-project-description-sunra-120312aphfinal.pdf
0.1 MiB
13
4 2018-04-17 CEDR Open Data For  Transport Authorities Vienna FWD
May 3, 2018
4 2018-04-17 CEDR Open Data For Transport Authorities Vienna FWD
4-2018-04-17_CEDR_Open_data_for-_transport_authorities_Vienna_FWD.pdf
0.8 MiB
13
3  20180417 ENCORD TRA Final
May 3, 2018
3 20180417 ENCORD TRA Final
3.-20180417-ENCORD-TRA_Final.pdf
0.2 MiB
12
2.1 20180417 CEDG BG Open Data SvD
May 3, 2018
2.1 20180417 CEDG BG Open Data SvD
2.1-20180417-CEDG-BG-open-data-SvD.pdf
0.2 MiB
12
1.1 Open Data-Tom Roelants
May 3, 2018
1.1 Open Data-Tom Roelants
1.1-Open-Data-Tom-Roelants.pdf
0.5 MiB
12
05 Sunra D5 Results Questionnaire
April 4, 2018
05 Sunra D5 Results Questionnaire
05_sunra-d5_results-questionnaire.pdf
0.6 MiB
10
AM4INFRA-D3.2-BBP-ANAS-FINAL-2018.03.29 Rev1
June 11, 2018
AM4INFRA-D3.2-BBP-ANAS-FINAL-2018.03.29 Rev1
AM4INFRA-D3.2-BBP-ANAS-FINAL-2018.03.29_rev1.pdf
2.7 MiB
8
AM4INFRA-D2.3 FRAMEWORK-not-yet-approved
June 11, 2018
AM4INFRA-D2.3 FRAMEWORK-not-yet-approved
AM4INFRA-D2.3_FRAMEWORK-not-yet-approved.pdf
1.9 MiB
4
AM4INFRA-D2.1-Whole-Life-Cost-and-Risk-Based-models-for-Road-Asset-Management-
June 11, 2018
AM4INFRA-D2.1-Whole-Life-Cost-and-Risk-Based-models-for-Road-Asset-Management-
AM4INFRA-D2.1-Whole-Life-Cost-and-Risk-Based-models-for-Road-Asset-Management-.pdf
0.6 MiB
3
AM4INFRA-D2.2-CASE-EXAMPLES-OF-GOOD-PRACTICE-FOR-APPLYING-WHOLE-LIFE-COST-AND-RISK-FINAL
June 11, 2018
AM4INFRA-D2.2-CASE-EXAMPLES-OF-GOOD-PRACTICE-FOR-APPLYING-WHOLE-LIFE-COST-AND-RISK-FINAL
AM4INFRA-D2.2-CASE-EXAMPLES-OF-GOOD-PRACTICE-FOR-APPLYING-WHOLE-LIFE-COST-AND-RISK-FINAL.pdf
3.9 MiB
3
AM4INFRA-D45-Replication-Assessment-FINAL-003
June 11, 2018
AM4INFRA-D45-Replication-Assessment-FINAL-003
AM4INFRA-D45-Replication-Assessment-FINAL-003.pdf
0.7 MiB
3
TRA 2012 Conference Conclusions Thursday 26 Plenary Preparing The Future GIANNOPOULOS Final
June 21, 2018
TRA 2012 Conference Conclusions Thursday 26 Plenary Preparing The Future GIANNOPOULOS Final
TRA-2012_Conference-Conclusions_Thursday-26_Plenary-Preparing-the-future_GIANNOPOULOS_Final.pptx
0.4 MiB
3
AM4INFRA-D1.1-Framework-architecture-for-smart-governance-of-Transportation-Networks
June 11, 2018
AM4INFRA-D1.1-Framework-architecture-for-smart-governance-of-Transportation-Networks
AM4INFRA-D1.1-Framework-architecture-for-smart-governance-of-Transportation-Networks.pdf
0.4 MiB
2
SAFEROAD Final Report
June 19, 2018
SAFEROAD Final Report
SAFEROAD-Final-Report.pdf
1.9 MiB
2
2018 IWA Urban Drainage SG Newsletter 2018
June 13, 2018
2018 IWA Urban Drainage SG Newsletter 2018
2018_IWA_Urban_Drainage_SG_Newsletter_2018.pdf
1.5 MiB
2
AM4INFRA-D1.2-Guideline-for-the-use-of-the-framework-architecture-FINAL-October-2017
June 11, 2018
AM4INFRA-D1.2-Guideline-for-the-use-of-the-framework-architecture-FINAL-October-2017
AM4INFRA-D1.2-Guideline-for-the-use-of-the-framework-architecture-FINAL-October-2017.pdf
2.5 MiB
2
AM4INFRA-D3.1-Asset Data Dictionary-ANAS-FINAL-2017
June 11, 2018
AM4INFRA-D3.1-Asset Data Dictionary-ANAS-FINAL-2017
AM4INFRA-D3.1-Asset_Data_Dictionary-ANAS-FINAL-2017.03.29.pdf
3.1 MiB
2
D-1.3-Living-Labs-FINAL-not-yet-approved
June 11, 2018
D-1.3-Living-Labs-FINAL-not-yet-approved
D-1.3-Living-Labs-FINAL-not-yet-approved.pdf
2.6 MiB
2
Bat Mitigation On Roads In Europe An Overview
June 18, 2018
Bat Mitigation On Roads In Europe An Overview
Bat_mitigation_on_roads_in_Europe_An_overview.pdf
0.8 MiB
2
Effectiveness Of Bat Mitigation On Roads A Review
June 18, 2018
Effectiveness Of Bat Mitigation On Roads A Review
Effectiveness_of_bat_mitigation_on_roads_A_review.pdf
0.8 MiB
2
Technical Report 6 Guidelines For Evaluating The Performance Of Road Mitigation Measures
June 19, 2018
Technical Report 6 Guidelines For Evaluating The Performance Of Road Mitigation Measures
Technical-Report-6_Guidelines-for-evaluating-the-performance-of-road-mitigation-measures.pdf
6.9 MiB
2
D1.3 Final Report
June 19, 2018
D1.3 Final Report
D1.3_Final-Report.pdf
0.5 MiB
2
CEDR METHOD D1.1 Technical Report 1
June 19, 2018
CEDR METHOD D1.1 Technical Report 1
CEDR-METHOD-D1.1-Technical-Report-1.pdf
0.6 MiB
2
Esret User Guide
June 20, 2018
Esret User Guide
esret_user_guide.pdf
3.7 MiB
2
TRA2012 1st Call Of Abstracts Papers
June 21, 2018
TRA2012 1st Call Of Abstracts Papers
TRA2012-1st-Call-of-Abstracts_Papers.pdf
4.3 MiB
2
TRA2012 Fifth Newsletter - April 2012
June 21, 2018
TRA2012 Fifth Newsletter - April 2012
TRA2012-fifth-newsletter-April-2012.pdf
0.4 MiB
2
TRA2012 Fourth Newsletter
June 21, 2018
TRA2012 Fourth Newsletter
TRA2012-fourth-newsletter.pdf
0.3 MiB
2
Slovene Offer For TRA2008 Letter V Zavrlan 1 30-06-2005
June 22, 2018
Slovene Offer For TRA2008 Letter V Zavrlan 1 30-06-2005
Slovene-offer-for-TRA2008-Letter-V.Zavrlan-1-30-06-2005.pdf
0.1 MiB
2
TRA2014 CEDR Chair's Welcome Address
June 22, 2018
TRA2014 CEDR Chair's Welcome Address
TRA2014-CEDR-Chairs-Welcome-Address.pdf
0.4 MiB
2
TRA 2006 Ad 2006-03-16(final)
June 11, 2018
TRA 2006 Ad 2006-03-16(final)
TRA-2006-Ad-2006-03-16final.pdf
0.1 MiB
1
Conference Proposal (2004-03-03) Göteborg 2006
June 11, 2018
Conference Proposal (2004-03-03) Göteborg 2006
Conference-proposal-2004-03-03-Göteborg-2006.pdf
0.2 MiB
1
TRA 2006 Promotion Letter (2006-03-20)
June 11, 2018
TRA 2006 Promotion Letter (2006-03-20)
TRA-2006-Promotion-Letter-2006-03-20.pdf
0.1 MiB
1
TRA2008 1st Announcment V4
June 11, 2018
TRA2008 1st Announcment V4
TRA2008-1st-announcment-v4.pdf
0.3 MiB
1
CEDR Chairman invitation for GB to contribute -ENG
June 11, 2018
CEDR Chairman invitation for GB to contribute -ENG
Lemlin-to-GB-members-Invitation-to-contribute-engl.pdf
77 KiB
1
Project GENESYS April 03
June 11, 2018
Project GENESYS April 03
Project-GENESYS.April-03.pdf
0.3 MiB
1
French Offer For TRA 2014 13 Sept 2010
June 22, 2018
French Offer For TRA 2014 13 Sept 2010
French-offer-for-TRA-2014-13-sept-2010.pdf
0.8 MiB
1
Bat Mitigation On Roads A Field Experiment Of Hop Overs
June 18, 2018
Bat Mitigation On Roads A Field Experiment Of Hop Overs
Bat_mitigation_on_roads_A_field_experiment_of_hop_overs.pdf
1.3 MiB
1
Bat Mitigation On Roads Final Project Report
June 18, 2018
Bat Mitigation On Roads Final Project Report
Bat_mitigation_on_roads_Final_project_report.pdf
1.6 MiB
1
Bat Mitigation On Roads Future Research Needs
June 18, 2018
Bat Mitigation On Roads Future Research Needs
Bat_mitigation_on_roads_Future_research_needs.pdf
0.3 MiB
1
Guidelines For Bat Mitigation On Roads
June 18, 2018
Guidelines For Bat Mitigation On Roads
Guidelines_for_bat_mitigation_on_roads.pdf
2.0 MiB
1
SafeBatPaths
June 18, 2018
SafeBatPaths
SafeBatPaths.pdf
0.3 MiB
1
SAFEROAD Flyerpdf
June 19, 2018
SAFEROAD Flyerpdf
SAFEROAD-Flyerpdf.pdf
0.4 MiB
1
SAFEROAD Project Description
June 19, 2018
SAFEROAD Project Description
SAFEROAD-Project-Description.pdf
0.2 MiB
1
Technical Report 1 Roads And Wildlife Legal Requirements And Policy Targets
June 19, 2018
Technical Report 1 Roads And Wildlife Legal Requirements And Policy Targets
Technical-Report-1_Roads-and-Wildlife_Legal-Requirements-and-Policy-Targets.pdf
1.5 MiB
1
Technical Report 2 Guidlines For Outcome-based Specifications In Road Mitigation
June 19, 2018
Technical Report 2 Guidlines For Outcome-based Specifications In Road Mitigation
Technical-Report-2_Guidlines-for-outcome-based-specifications-in-road-mitigation.pdf
1.5 MiB
1
Technical Report 3 Modelling The Performance Of Road Mitigation Strategies - Popluation Effects Of Permeability For Wildlife
June 19, 2018
Technical Report 3 Modelling The Performance Of Road Mitigation Strategies - Popluation Effects Of Permeability For Wildlife
Technical-Report-3_Modelling-the-performance-of-road-mitigation-strategies-Popluation-effects-of-permeability-for-wildlife.pdf
8.6 MiB
1
Technical Report 4 Cost Benefit Analyses For Wildlife And Traffic Safety
June 19, 2018
Technical Report 4 Cost Benefit Analyses For Wildlife And Traffic Safety
Technical-report-4_Cost-benefit-analyses-for-wildlife-and-traffic-safety.pdf
5.1 MiB
1
Technical Report 5 Road Maintnance Guidelines To Improve Wildlife Conservation And Traffic Safety
June 19, 2018
Technical Report 5 Road Maintnance Guidelines To Improve Wildlife Conservation And Traffic Safety
Technical-Report-5_Road-Maintnance-Guidelines-to-Improve-Wildlife-Conservation-and-Traffic-Safety.pdf
8.7 MiB
1
Technical Report 7 Case Studies On The Effect Of Local Road And Verge Features On Ungulate-vehicle Collisions
June 19, 2018
Technical Report 7 Case Studies On The Effect Of Local Road And Verge Features On Ungulate-vehicle Collisions
Technical-Report-7_Case-studies-on-the-effect-of-local-road-and-verge-features-on-ungulate-vehicle-collisions.pdf
4.6 MiB
1
D4.1 Guidelines And Implementation Steps For Pro-Active Traffic Incident Management
June 19, 2018
D4.1 Guidelines And Implementation Steps For Pro-Active Traffic Incident Management
D4.1_Guidelines-and-Implementation-Steps-for-Pro-Active-Traffic-Incident-Management.pdf
0.7 MiB
1
PRIMA D1.1 Inception Report
June 19, 2018
PRIMA D1.1 Inception Report
PRIMA_D1.1_Inception_Report.pdf
0.5 MiB
1
PRIMA D1.2a Progress Report
June 19, 2018
PRIMA D1.2a Progress Report
PRIMA_D1.2a_Progress_Report.pdf
0.3 MiB
1
PRIMA D1.2b Progress Report
June 19, 2018
PRIMA D1.2b Progress Report
PRIMA_D1.2b_Progress_Report.pdf
0.3 MiB
1
PRIMA D2.1 Stakeholder Consultation
June 19, 2018
PRIMA D2.1 Stakeholder Consultation
PRIMA_D2.1_Stakeholder-Consultation.pdf
0.4 MiB
1
PRIMA D2.2 Report On Best Practice, Needs And Derived Incident Scenarios
June 19, 2018
PRIMA D2.2 Report On Best Practice, Needs And Derived Incident Scenarios
PRIMA_D2.2_Report-on-best-practice-needs-and-derived-incident-scenarios.pdf
1.1 MiB
1
PRIMA D3.1 Assessment Results Of Incident Management Procedures
June 19, 2018
PRIMA D3.1 Assessment Results Of Incident Management Procedures
PRIMA_D3.1-Assessment-results-of-incident-management-procedures.pdf
1.9 MiB
1
PRIMA D3.2 Description And Results Of Cost-benefit
June 19, 2018
PRIMA D3.2 Description And Results Of Cost-benefit
PRIMA_D3.2_Description-and-results-of-cost-benefit.pdf
0.7 MiB
1
CEDR METHOD D2.2 Technical Report 2
June 19, 2018
CEDR METHOD D2.2 Technical Report 2
CEDR-METHOD-D2.2-Technical-Report-2.pdf
0.7 MiB
1
CEDR METHOD D3.1 Sim Studies
June 19, 2018
CEDR METHOD D3.1 Sim Studies
CEDR-METHOD-D3.1-Sim-Studies.pdf
0.7 MiB
1
CEDR METHOD D1.2 Guidance Booklet
June 19, 2018
CEDR METHOD D1.2 Guidance Booklet
CEDR_METHOD-D1.2-Guidance-Booklet.pdf
0.6 MiB
1
ESReT
June 20, 2018
ESReT
ESReT.pdf
0.2 MiB
1
TRA2012 POSTER
June 21, 2018
TRA2012 POSTER
TRA2012-POSTER.JPG
0.8 MiB
1
METHOD Project Description
June 21, 2018
0.2 MiB
1
PRIMA Project Description
June 21, 2018
0.2 MiB
1
UNIETD Project Description
June 21, 2018
0.2 MiB
1
TRA2014 BROCHURE
June 22, 2018
TRA2014 BROCHURE
TRA2014_BROCHURE.PDF
0.9 MiB
1
Close

Login to CEDR public website

Lost Password?